Difference between revisions of "ASM Membrane Gutter (Design Elements)"

Jump to: navigation, search

Difference between revisions of "ASM Membrane Gutter (Design Elements)"

(Created page with "<hr> File:8.3.1.jpg ;WORK INCLUDED (1) <b>MEMBRANES:</b> Membranes must be installed to <i>RGC Guarantee Standards</i> and the manufacturer's printed instructions (2) <...")
 
Line 18: Line 18:
 
(B) <b>ACCEPTABLE DECK</b>
 
(B) <b>ACCEPTABLE DECK</b>
  
NOTE: <b>*</b> Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
 
 +
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
 +
 
  
 
<hr>
 
<hr>
 +
  
  
Line 27: Line 30:
  
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Construction Details'']]
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Construction Details'']]
 +
 +
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]

Revision as of 18:58, 19 July 2016


8.3.1.jpg

WORK INCLUDED

(1) MEMBRANES: Membranes must be installed to RGC Guarantee Standards and the manufacturer's printed instructions

(2) ADHESION: Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c

(3) HEIGHT: The minimum vertical sealed height above the maximum water level is 150 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions.

(4) EAVE PROTECTION: Built-in gutter membranes can be extended to act as an eave protection membrane. Underlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 200 mm (8") and be installed in shingle fashion (not shown for clarity).

RELATED WORK BY OTHERS

(A) DIMENSIONS: Dimensions of parapets, cants and water loading of gutters are variable and should be determined by design authority

(B) ACCEPTABLE DECK


NOTE: Refer to RGC Guarantee Standards for additional requirements.





Back to ASM Application

Back to ASM Construction Details

Back to Construction Details