Difference between revisions of "SBS Parapet-Wall Connection"

Jump to: navigation, search

Difference between revisions of "SBS Parapet-Wall Connection"

(Created page with "File:10.3.1.4.jpg === WORK INCLUDED === (1) <b>Gypsum Overlay Board: </b>If required by design authority. (2) <b>Vapour Retarder</b>: If required by design authority....")
 
(RELATED WORK BY OTHERS)
Line 38: Line 38:
  
 
(G) <b>Wall Cladding</b>
 
(G) <b>Wall Cladding</b>
 +
  
 
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
 
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.

Revision as of 20:11, 19 July 2016

10.3.1.4.jpg

1 WORK INCLUDED

(1) Gypsum Overlay Board: If required by design authority.

(2) Vapour Retarder: If required by design authority.

(3) Insulation: See list of accepted materials in Section 2.2.

(4) Insulation Overlay: As required. See RGC Guarantee Standard B4.1, B4.2 and C4.1

(5) Primary Membrane and Membrane Protection

(6) Membrane Flashing: Mechanically fasten at terminations. At least one ply must extend over outside edge. See RGC Guarantee Standard A5.6

(7) Metal Base Flashing: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See RGC Guarantee Standard A6.9

(8) Metal Cap Flashing: Must overlap exterior wall finish. See RGC Guarantee Standard A6.9 Fasten with concealed clip-type fasteners or cladding screws evenly spaced between seams. See RGC Guarantee Standard A6.10.

(9) Wall Tie-In Membrane: Minimum 2 mm (0.078") self-adhered modified bitumen or flexible membrane manufacturer’s approved detail.

(10) Metal Counter Flashing

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

(B) Air / Vapour Seal

(C) Acceptable Wall Surface

(D) Wood Blocking

(E) Sloped Wood Blocking: Required over 100 mm (4") parapet width. See RGC Guarantee Standard A6.9

(F) Wall Sheathing Membrane

(G) Wall Cladding


NOTE: Refer to RGC Guarantee Standards for additional requirements.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details