Difference between revisions of "EPDM Roof System Details"

Jump to: navigation, search

Difference between revisions of "EPDM Roof System Details"

Line 1: Line 1:
The drawings contained within this section are intended to represent a variety of modified bituminous roof system designs while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.
+
The drawings contained within this section are intended to represent a variety of thermoset membrane roof system designs while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.
  
For further information about SBS membrane system designs, see '''[[EPDM (Thermoset Membranes) Roof Systems]]'''.
+
For further information about thermoset membrane (EPDM) system designs, see '''[[EPDM (Thermoset Membranes) Roof Systems]]'''.
  
  

Revision as of 20:29, 19 July 2016

The drawings contained within this section are intended to represent a variety of thermoset membrane roof system designs while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.

For further information about thermoset membrane (EPDM) system designs, see EPDM (Thermoset Membranes) Roof Systems.


D2.7.1 Mechanically Attached Generic Conventional Assembly
D2.7.2 Fully Adhered
D2.7.3 Ballasted Protected Membrane
D2.7.4 Curb Opening
D2.7.5 Clamping Copper Drain
D2.7.6 Two-Part Box Flashing
D2.7.7 Mechanical Curb Opening

NOTE: The following pages are currently under construction
D2.7.8 Roof Edge (Under Construction)
D2.7.1 Assemblies (Insulated Conventional)(Under Construction)
D2.7.2 Assemblies (Protected Membrane)(Under Construction)
D2.7.3 Parapets & Copings (High - Wall Supported)(Under Construction)
D2.7.4 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D2.7.5 Edges & Fascia (Cant Edge)(Under Construction)
D2.7.6 Edges & Fascia (Gravel Stop)(Under Construction)
D2.7.7 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D2.7.8 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D2.7.9 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D2.7.10 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D2.7.11 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D2.7.12 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D2.7.13 Counter-flashings & Reglets (Window Curb)(Under Construction)
D2.7.14 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D2.7.15 Roof-Wall Transitions (Divider/Joint)(Under Construction)
D2.7.16 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D2.7.17 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D2.7.18 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D2.7.19 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
D2.7.20 Curbs & Sleepers (Basic Curb)(Under Construction)
D2.7.21 Curbs & Sleepers (Mechanical Opening)(Under Construction)
D2.7.22 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)
D2.7.23 Strip-in Flashings (Metal Plumbing)(Under Construction)
D2.7.24 Strip-in Flashings (Two-part Cable)(Under Construction)
D2.7.25 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D2.7.26 Water & Drainage (Cast Iron Drain)(Under Construction)
D2.7.27 Water & Drainage (Spun Copper Drain)(Under Construction)
D2.7.28 Water & Drainage (Clamping Spun Copper Drain)(Under Construction)
D2.7.29 Water & Drainage (Open Wall Scupper)(Under Construction)
D2.7.30 Water & Drainage (Through-wall Scupper)(Under Construction)
D2.7.31 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D2.7.32 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D2.7.33 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)


Back to EPDM Roof Systems

Back to Construction Details Section