Difference between revisions of "SBS Tall Parapet"

Jump to: navigation, search

Difference between revisions of "SBS Tall Parapet"

(RELATED WORK BY OTHERS)
Line 3: Line 3:
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
  
(1) <b>Gypsum Overlay Board: </b>If required by design authority.
+
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Overlay Board''']]: If required by design authority.
 
+
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
(2) <b>Vapour Retarder:</b> If required by design authority.
+
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 
+
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: As required.  
(3) <b>Insulation</b><b>:</b> See list of accepted materials in Section 2.2.
+
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
 
+
;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Base Sheet Flashing''']]: Mechanically fasten to parapet at termination.
(4) <b>Insulation</b><b> Overlay:</b> As required. See <i>RGC Guarantee Standard B4.1, B4.2, C4.1 and C4.2</i>
+
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETAL|'''Base Metal Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See '''Section 12.6 - Cap Flashings, Base Flashings and Reglet'''s.
 
+
;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETAL|'''Metal Counter Flashing''']]: Minimum 250 mm (10") above roof surface.  
(5) <b>Primary Membrane and Membrane Protection</b>
+
;(9) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETAL|'''Metal Cap Flashing''']]: Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See '''Section 12.6 - Cap Flashings, Base Flashings and Reglets'''.
 
 
(6) <b>Membrane Flashing:</b> Mechanically fasten to parapet at termination.
 
 
 
(7) <b>Metal Base Flashing:</b> Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See <i>RGC Guarantee Standard A6.9</i>
 
 
 
(8) <b>Metal Counter Flashing:</b> Minimum 250 mm (10") above roof surface.  
 
 
 
(9) <b>Metal Cap Flashing:</b> Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See <i>RGC Guarantee Standards A6.9 and 6.10</i>
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
  
(A) <b>Acceptable Deck</b>
+
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STEELDECK|'''Acceptable Deck''']]
 
+
;(B) '''Air / Vapour Seal'''
(B) <b>Air / Vapour Seal</b>
+
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLSUB|'''Acceptable Wall Surface''']]
 
+
;(D) '''Wood Blocking'''
(C) <b>Acceptable Wall Surface</b>
+
;(E) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]: Required over 100 mm (4") parapet width.
 
+
;(F) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Wall Sheathing Membrane''']]: Minimum 1 mm (0.040") self-adhered modified bitumen.
(D) <b>Wood Blocking</b>
+
;(G) '''Exterior Wall Finish'''
 
+
;(H) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise).
(E) <b>Sloped Wood Blocking:</b> Required over 100 mm (4") parapet width. See <i>RGC Guarantee Standard A6.9.</i>
+
;(I) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Cap Flashing Underlay''']]:Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen.
 
 
(F) <b>Wall Sheathing Membrane:</b> Minimum 1 mm (0.040") self-adhered modified bitumen. See <i>RGC Guarantee Standard A5.6.</i>
 
 
 
(G) <b>Exterior Wall Finish</b>
 
 
 
(H) <b>Metal</b><b> Cap Flashing</b>: Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise).
 
 
 
(I) <b>Cap Flashing underlay</b>: Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen. See <i>RGC Guarantee Standard A5.6</i>
 
  
  

Revision as of 20:58, 29 July 2016

10.3.1.3.jpg

1 WORK INCLUDED

(1) Gypsum Overlay Board
If required by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
As required.
(5) Primary Membrane and Membrane Protection
(6) Base Sheet Flashing
Mechanically fasten to parapet at termination.
(7) Base Metal Flashing
Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See Section 12.6 - Cap Flashings, Base Flashings and Reglets.
(8) Metal Counter Flashing
Minimum 250 mm (10") above roof surface.
(9) Metal Cap Flashing
Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See Section 12.6 - Cap Flashings, Base Flashings and Reglets.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Acceptable Wall Surface
(D) Wood Blocking
(E) Sloped Wood Blocking
Required over 100 mm (4") parapet width.
(F) Wall Sheathing Membrane
Minimum 1 mm (0.040") self-adhered modified bitumen.
(G) Exterior Wall Finish
(H) Metal Cap Flashing
Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise).
(I) Cap Flashing Underlay
Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen.


NOTE: Refer to RGC Guarantee Standards for additional requirements.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details