(Created page with "File:10.3.2.2.jpg === WORK INCLUDED === (1) <b>Vapor Retarder: </b>If required by design authority (2) <b>Insulation:</b> See list of accepted materials in Section 2.2...")
 
Line 2: Line 2:
  
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
(1) <b>Vapor Retarder: </b>If required by design authority
+
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority
 
+
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
(2) <b>Insulation:</b>  See list of accepted materials in Section 2.2.
+
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: Where required.
 
+
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]: Mechanically fasten to outside face of fascia (C).
(3) <b>Insulation Overlay:</b>  Where required. See <i>RGC Guarantee Standard B4.1, B4.2 </i>and<i> C4.1</i>
+
;(5) '''Mastic:''' Trowel coating of compatible mastic.
 
+
;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Edge/Gravel-stop Flashing''']]: Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.
(4) <b>Primary Membrane and Membrane Protection:</b> Mechanically fasten to outside face of fascia (C).
+
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Membrane Flashing''']]: Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m&#178; polyester felt. For flexible membrane systems, refer to manufacturer&#8217;s application details and RGC Guarantee Standards.
 
+
;(8) <b>Asphalt:</b>  For asphalt and gravel built-up roofing systems only.
(5) <b>Mastic:</b> Trowel coating of compatible mastic.
+
;(9) <b>Gravel:</b>  For asphalt and gravel built-up roofing systems only.
 
 
(6) <b>Metal Edge/Gravel-stop Flashing:</b> Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.
 
 
 
(7) <b>Membrane Flashing:</b>  Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m&#178; polyester felt. For flexible membrane systems, refer to manufacturer&#8217;s application details and RGC Guarantee Standards.
 
 
 
(8) <b>Asphalt:</b>  For asphalt and gravel built-up roofing systems only.
 
 
 
(9) <b>Gravel:</b>  For asphalt and gravel built-up roofing systems only.
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
(A) <b>Acceptable Deck</b>
+
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']]
 
+
;(B) <b>Wood Blocking</b>
(B) <b>Wood Blocking</b>
+
;(C) <b>Wood Fascia</b>
 
 
(C) <b>Wood Fascia</b>
 
  
 
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
 
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.

Revision as of 22:31, 29 July 2016

10.3.2.2.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority
(2) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(3) Insulation Overlay Board
Where required.
(4) Primary Membrane and Membrane Protection
Mechanically fasten to outside face of fascia (C).
(5) Mastic: Trowel coating of compatible mastic.
(6) Metal Edge/Gravel-stop Flashing
Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.
(7) Membrane Flashing
Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m² polyester felt. For flexible membrane systems, refer to manufacturer’s application details and RGC Guarantee Standards.
(8) Asphalt: For asphalt and gravel built-up roofing systems only.
(9) Gravel: For asphalt and gravel built-up roofing systems only.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wood Blocking
(C) Wood Fascia

NOTE: Refer to RGC Guarantee Standards for additional requirements.