Difference between revisions of "SBS Curb for Multiple Penetrations"
Difference between revisions of "SBS Curb for Multiple Penetrations"
(→RELATED WORK BY OTHERS) |
|||
Line 2: | Line 2: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | (1) | + | ;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Overlay Board''']]: If required by design authority. |
− | + | ;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority. | |
− | (2) | + | ;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. |
− | + | ;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: As required. | |
− | (3) | + | ;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']] |
− | + | ;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSTRIPTERM|'''Membrane Flashing''']]:Mechanically fasten to top of curb (C). | |
− | (4) | + | ;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Base Metal Flashing''']]: Mechanically fasten to top of curb, standing seam at corners of cant, optional on flexible membrane systems.<b> </b>Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. |
− | + | ;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Counter Flashing''']] | |
− | (5) | + | ;(9) '''Metal Hood''' |
− | |||
− | (6) | ||
− | |||
− | (7) | ||
− | |||
− | (8) | ||
− | |||
− | (9) | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | (A) | + | ;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']] |
− | + | ;(B) '''Air / Vapour Seal''' | |
− | (B) | + | ;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSCURB|'''Wood Blocking/Curb''']]: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface. |
− | |||
− | (C) | ||
Revision as of 18:39, 4 August 2016
1 WORK INCLUDED
- (1) Gypsum Overlay Board
- If required by design authority.
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay Board
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- Mechanically fasten to top of curb (C).
- (7) Base Metal Flashing
- Mechanically fasten to top of curb, standing seam at corners of cant, optional on flexible membrane systems. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Counter Flashing
- (9) Metal Hood
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Air / Vapour Seal
- (C) Wood Blocking/Curb
- Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface.
NOTE: Refer to RGC Guarantee Standards for additional requirements.