Difference between revisions of "SBS Parapet (Independent of Roof Structure)"
Difference between revisions of "SBS Parapet (Independent of Roof Structure)"
(→RELATED WORK BY OTHERS) |
(→WORK INCLUDED) |
||
Line 2: | Line 2: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Overlay | + | ;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']] |
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority. | ;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority. | ||
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']] | ;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']] | ||
Line 9: | Line 9: | ||
;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Membrane Flashing''']]: Mechanically fasten to outside face of parapet blocking (F). Do not mop outside edge. At least one ply must extend over outside edge. | ;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Membrane Flashing''']]: Mechanically fasten to outside face of parapet blocking (F). Do not mop outside edge. At least one ply must extend over outside edge. | ||
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Base Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See '''Section 12.6 - Cap Flashings, Base Flashings and Reglets'''. | ;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Base Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See '''Section 12.6 - Cap Flashings, Base Flashings and Reglets'''. | ||
− | ;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Flashings 7 and 8 may be one piece. See Section 12.6. | + | ;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Flashings 7 and 8 may be one piece. See Section 12.6. Fasten with continuous concealed clip-type fasteners <b>or</b> cladding screws evenly spaced between seams. See '''Section 12.3 - Attachment'''. |
+ | |||
+ | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === |
Revision as of 18:59, 4 August 2016
1 WORK INCLUDED
- (1) Gypsum Deck Overlay
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- (4) Insulation Overlay Board
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- Mechanically fasten to outside face of parapet blocking (F). Do not mop outside edge. At least one ply must extend over outside edge.
- (7) Metal Base Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See Section 12.6 - Cap Flashings, Base Flashings and Reglets.
- (8) Metal Cap Flashing
- Flashings 7 and 8 may be one piece. See Section 12.6. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. See Section 12.3 - Attachment.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Air / Vapour Seal
- (C) Acceptable Wall Surface
- (D) Wood Blocking
- (E) Flexible Insulation
- (C) Sloped Wood Blocking
- Required over 100 mm (4") parapet width.
NOTE: Refer to RGC Guarantee Standards for additional requirements.