Difference between revisions of "SBS Parapet-Wall Connection"

Jump to: navigation, search

Difference between revisions of "SBS Parapet-Wall Connection"

(RELATED WORK BY OTHERS)
(WORK INCLUDED)
Line 3: Line 3:
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
  
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Board''']]: If required by design authority.
+
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
 
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]:If required by design authority.
 
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]:If required by design authority.
 
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]:
 
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]:
Line 15: Line 15:
 
;(9) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLTIEIN|'''Wall Tie-in''']]: Minimum 2 mm (0.078") self-adhered  modified bitumen or flexible membrane manufacturers approved detail.
 
;(9) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLTIEIN|'''Wall Tie-in''']]: Minimum 2 mm (0.078") self-adhered  modified bitumen or flexible membrane manufacturers approved detail.
 
;(10) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Counter-flashing''']]:
 
;(10) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Counter-flashing''']]:
 +
 +
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===

Revision as of 19:00, 4 August 2016

10.3.1.4.jpg

1 WORK INCLUDED

(1) Gypsum Deck Overlay
If required by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
See list of Accepted Materials.
(4) Insulation Overlay Board
As required.
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing (attachment & termination)
Mechanically fasten at terminations. At least one ply must extend over outside edge.
(7) Metal Base Flashing
Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
(8) Metal Cap Flashing
Must overlap exterior wall finish. Fasten with concealed clip-type fasteners or cladding screws evenly spaced between seams.
(9) Wall Tie-in
Minimum 2 mm (0.078") self-adhered modified bitumen or flexible membrane manufacturers approved detail.
(10) Metal Counter-flashing

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air/Vapour Seal
(C) Acceptable Wall Surface
(D) Wood Blocking
(E) Sloped Wood Blocking
Required over 100 mm (4") parapet width.
(F) Wall Sheathing Membrane
Minimum 1 mm (0.040") self-adhered modified bitumen.
(G) Wall Cladding


NOTE: Refer to RGC Guarantee Standards for additional requirements.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details