=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
+
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
 
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
 
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
 
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: Where required.
 
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: Where required.
 
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
 
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''MembraneFlashing''']]:>
+
;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''MembraneFlashing''']]
 
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Membrane Counter Flashing''']]
 
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Membrane Counter Flashing''']]
 
;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Base Metal Flashing''']]: Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
 
;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Base Metal Flashing''']]: Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
Line 13: Line 13:
 
;(10)  '''Secondary Metal Cap Flashing''': Joints to be offset from Cap Flashing, <b>OR</b> Water Channeling Clip may be used (See inset for detail [[SBS Details:D1.7.19 Roof-Wall Transitions (Fire Separation Wall)|'''D1.7.19 Roof-Wall Transitions (Fire Separation Wall)''']]), <b>OR</b> solder standing seam joints. Do <b><u>NOT</u></b> place combustible materials over top of firewall.
 
;(10)  '''Secondary Metal Cap Flashing''': Joints to be offset from Cap Flashing, <b>OR</b> Water Channeling Clip may be used (See inset for detail [[SBS Details:D1.7.19 Roof-Wall Transitions (Fire Separation Wall)|'''D1.7.19 Roof-Wall Transitions (Fire Separation Wall)''']]), <b>OR</b> solder standing seam joints. Do <b><u>NOT</u></b> place combustible materials over top of firewall.
 
;(11) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Standing seam joints required.
 
;(11) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Standing seam joints required.
 +
 +
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===

Revision as of 19:21, 4 August 2016

10.3.4.3.jpg

1 WORK INCLUDED

(1) Gypsum Deck Overlay
If required by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
Where required.
(5) Primary Membrane and Membrane Protection
(6) MembraneFlashing
(7) Membrane Counter Flashing
(8) Base Metal Flashing
Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
(9) Metal Flashing / Cladding
(10) Secondary Metal Cap Flashing
Joints to be offset from Cap Flashing, OR Water Channeling Clip may be used (See inset for detail D1.7.19 Roof-Wall Transitions (Fire Separation Wall)), OR solder standing seam joints. Do NOT place combustible materials over top of firewall.
(11) Metal Cap Flashing
Standing seam joints required.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Acceptable Wall Surface (Plywood)
(C) Wood Blocking
(D) Grouted Finish
Sloped surface to promote drainage off cap flashing.


NOTE: Refer to RGC Guarantee Standards for additional requirements.