(RELATED WORK BY OTHERS)
Line 2: Line 2:
  
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
(1) <b>Gypsum Overlay Board: </b>If required by design authority.
+
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
 +
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
 +
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: Mechanically fastened.  See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 +
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
 +
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
 +
;(6) '''Mastic''':  As approved by manufacturer.
 +
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Base Sheet Flashing''']]: As approved by membrane manufacturer (See (C) below).
  
(2) <b>Vapour Retarder</b>: If required by design authority.
+
<hr>
 
 
(3) <b>Insulation:</b>  See list of accepted materials in Section 2.2.
 
 
 
(4) <b>Insulation Overlay</b>: Where required. See <i>RGC Guarantee Standard B4.1, B4.2 </i>and<i> C4.1</i>
 
 
 
(5) <b>Primary Membrane and Membrane Protection</b>
 
 
 
(6) <b>Mastic:</b>  As approved by manufacturer.
 
 
 
(7)<b> </b><b>Membrane Flashing:</b> As approved by membrane manufacturer (See (C) below).
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
(A) <b>Acceptable Deck</b>
+
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']]
 
+
;(B) '''Roof Drain Assembly'''
(B) <b>Roof Drain Assembly</b>
+
;(C) '''Lead Flashing''': Minimum 15 kg / m&#178; (3 lb / ft&#178;) weight lead sheet; flange extending minimum 25 mm (1") into bowl to 150 mm (6") beyond perimeter of drain; embed in mastic (6) and prime top surface where required by manufacturer or minimum 1 m x 1 m (39" x 39") 3 mm thick modified bituminous base sheet; to be supplied by trade supplying roof drain. For asphalt and gravel built-up systems <u>only</u>.
 
 
(C) <b>Lead Flashing:</b> Minimum 15 kg / m&#178; (3 lb / ft&#178;) weight lead sheet; flange extending minimum 25 mm (1") into bowl to 150 mm (6") beyond perimeter of drain; embed in mastic (6) and prime top surface where required by manufacturer or minimum 1 m x 1 m (39" x 39") 3 mm thick modified bituminous base sheet; to be supplied by trade supplying roof drain. For asphalt and gravel built-up systems <u>only</u>.
 
  
  
 
:'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
 
:'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
*Refer to <i>RGC Guarantee Standards</i> for additional requirements
 
* Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.
 
  
 +
* Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters)(current edition) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.
  
 
<hr>
 
<hr>

Revision as of 20:28, 5 August 2016

10.3.6.1.jpg

1 WORK INCLUDED

(1) Gypsum Deck Overlay
If required by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
(5) Primary Membrane and Membrane Protection
(6) Mastic
As approved by manufacturer.
(7) Base Sheet Flashing
As approved by membrane manufacturer (See (C) below).

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Roof Drain Assembly
(C) Lead Flashing
Minimum 15 kg / m² (3 lb / ft²) weight lead sheet; flange extending minimum 25 mm (1") into bowl to 150 mm (6") beyond perimeter of drain; embed in mastic (6) and prime top surface where required by manufacturer or minimum 1 m x 1 m (39" x 39") 3 mm thick modified bituminous base sheet; to be supplied by trade supplying roof drain. For asphalt and gravel built-up systems only.


NOTE: Refer to RGC Guarantee Standards for additional requirements.
  • Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters)(current edition) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.