Difference between revisions of "SBS Open-wall Scupper Drain"

Jump to: navigation, search

Difference between revisions of "SBS Open-wall Scupper Drain"

(RELATED WORK BY OTHERS)
Line 2: Line 2:
  
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
(1) <b>Vapour Retarder</b>: If required by design authority. (Optional terminations)
+
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
 +
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: Mechanically fastened.  See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 +
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: Where required.
 +
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
 +
;(5) '''Metal Scupper with Hopper''': The outside face of scupper to be 37.7mm (1&#189;") <b><u>lower</u></b><u> </u>than the box height with a 12.7mm (&#189;") drip edge. Installed in a thin bed of compatible mastic. Interface between outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
 +
;(6) '''Scupper Membrane Flashing'''
 +
;(7) '''Membrane Flashing'''
 +
;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Base Metal Flashing''']]: Mechanically fastened. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See <i>RGC Guarantee Standard A6.9</i>
 +
;(9) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. See <i>RGC Guarantee Standard A6.10 for requirements.</i> Flashing 8 and 9 may be one piece.
  
(2) <b>Insulation:</b> See list of accepted materials in Section 2.2.
+
<hr>
 
 
(3) <b>Insulation Overlay</b>: Where required. See <i>RGC Guarantee Standard B4.1, B4.2 </i>and<i> C4.1</i>
 
 
 
(4) <b>Primary Membrane and Membrane Protection</b>
 
 
 
(5) <b>Metal Scupper with Hopper:</b>: The outside face of scupper to be 37.7mm (1&#189;") <b><u>lower</u></b><u> </u>than the box height with a 12.7mm (&#189;") drip edge. Installed in a thin bed of compatible mastic. Interface between outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.:  re-roofing).
 
 
 
(6) <b>Scupper Membrane Flashing</b>
 
 
 
(7) <b>Membrane Flashing</b>
 
 
 
(8) <b>Metal Base Flashing:</b> Mechanically fastened. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See <i>RGC Guarantee Standard A6.9</i>
 
 
 
(9) <b>Metal Cap Flashing: </b> Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. See <i>RGC Guarantee Standard A6.10 for requirements.</i> Flashing 8 and 9 may be one piece.
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
(A) <b>Acceptable Deck</b>
+
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']]
 
+
;(B) '''Air / Vapour Seal'''
(B) <b>Air / Vapour Seal</b>
+
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWOODBLOCKING|'''Wood Blocking''']]
 
+
;(D) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLSUB|'''Acceptable Wall Surface - Plywood''']]
(C) <b>Wood Blocking Assembly</b>
+
;(E) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLSUB|'''Wall Finish''']]: Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.
 
 
(D) <b>Plywood:</b> If required by design authority. See <i>RGC Guarantee Standard A1.5</i>
 
 
 
(E) <b>Exterior Wall Finish:</b> Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.
 
  
  
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
  
  

Revision as of 21:07, 5 August 2016

10.3.6.4.gif

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
(3) Insulation Overlay Board
Where required.
(4) Primary Membrane and Membrane Protection
(5) Metal Scupper with Hopper
The outside face of scupper to be 37.7mm (1½") lower than the box height with a 12.7mm (½") drip edge. Installed in a thin bed of compatible mastic. Interface between outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
(6) Scupper Membrane Flashing
(7) Membrane Flashing
(8) Base Metal Flashing
Mechanically fastened. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See RGC Guarantee Standard A6.9
(9) Metal Cap Flashing
Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. See RGC Guarantee Standard A6.10 for requirements. Flashing 8 and 9 may be one piece.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Blocking
(D) Acceptable Wall Surface - Plywood
(E) Wall Finish
Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details