Difference between revisions of "SBS Flanged Insert Drain"

Jump to: navigation, search

Difference between revisions of "SBS Flanged Insert Drain"

(RELATED WORK BY OTHERS)
(RELATED WORK BY OTHERS)
Line 25: Line 25:
  
  
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Application'']]
+
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Application'']]
  
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Construction Details'']]
+
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 17:54, 8 August 2016

10.3.6.2.jpg

1 WORK INCLUDED

(1) Gypsum Deck Overlay
If required by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
Where required.
(5) Primary Membrane and Membrane Protection
(6) Mastic
As approved by manufacturer.
(7) Roof Drain Membrane Flashing
Onto primed drain flange or adhesive for non-bituminous flexible membrane systems.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Roof Drain Assembly


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.

  • Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.