Difference between revisions of "SBS Fall Protection Anchor in Roof"
Difference between revisions of "SBS Fall Protection Anchor in Roof"
(→WORK INCLUDED) |
(→WORK BY OTHERS) |
||
Line 26: | Line 26: | ||
− | [[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa | + | [[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Application'']] |
− | [[SBS Construction Details|<i class="fa fa-chevron-circle-left fa | + | [[SBS Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Construction Details'']] |
− | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa | + | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 17:55, 8 August 2016
1 WORK INCLUDED
- (1) Flashing
- 0.08 mm (0.032", 20 gauge) Aluminum or 0.56 mm (16 oz) copper to CSA B272-93 flashing supplied by anchor manufacturer with flanges sealed by roofer.
- (2) Flashing Flange
- minimum 100 mm (4") flange set in coating of compatible sealant.
- (3) Primary Membrane and Membrane Flashing.
- (4) Protected Membrane Roof Assembly
- Flashing to extend a minimum 200 mm (8") above finished roof surface (pavers, ballast, or walkways)
- (5) Conventional Roof Assembly
- Flashing to extend a minimum 200 mm (8") above finished roof surface.
- (6) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
2 WORK BY OTHERS
- (A) Acceptable Deck
- Concrete slab shown, see anchor manufacturer's attachment details for other deck types.
- (B) Roof Anchor
- to CSA Z91-M90
- (C) Anchor Eye
- to CSA Z91-M90
- (D) Water Tight Cap
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.