Difference between revisions of "ASM Valley (Hooked)"

Jump to: navigation, search

Difference between revisions of "ASM Valley (Hooked)"

(RELATED WORK BY OTHERS)
Line 1: Line 1:
<hr>
 
 
[[File:8.1.4.5.1.jpg]]
 
[[File:8.1.4.5.1.jpg]]
  
  
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
 +
;(1) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALLEYMEM |'''Valley Protection Membrane''']]: Accepted self-adhered modified bituminous eave protection membrane.
 +
;(2) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.
 +
;(3) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMSLIP|'''Slip Sheet''']]: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
 +
;(4) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALLEYPAN |'''Valley Metal Panel''']]: Preformed with centre rib and built-in continuous lock. 
 +
;(5) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMFASTENING |'''Fastening''']]: Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
 +
;(6) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMICE|'''Membrane Strip-in''']]: Accepted self-adhered modified bituminous eave protection membrane.
 +
;(7) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMPANEL |'''Architectural Metal Roof Panel''']]
 +
;(8) '''Continuous Built-In Hook Strip'''
 +
;(9) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALOVERLAP |'''Valley Panel Overlap''']]: Set in two continuous rows of accepted caulking or sealant tape.
  
(1) <b>Valley Protection Membrane</b>: Accepted self-adhered modified bituminous eave protection membrane.
+
<hr>
 
 
(2) <b>Underlayment</b>:  The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2).
 
 
 
(3) <b>Slip Sheet</b>: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
 
 
 
(4) <b>Valley Metal Panel</b>: Preformed with centre rib and built-in continuous lock. 
 
 
 
(5) <b>Fastening</b>:  Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
 
 
 
(6) <b>Membrane Strip-In</b>: Accepted self-adhered modified bituminous eave protection membrane.
 
 
 
(7) <b>Architectural Metal Roof Panel</b>
 
 
 
(8) <b>Continuous Built-In Hook Strip</b>
 
 
 
(9) <b>Valley Panel Overlap : </b>Set in two continuous rows of accepted caulking or sealant tape.
 
 
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
 
+
;(A) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMDECK|'''Acceptable Deck''']]
(A) <b>Acceptable Deck</b>
 
  
  
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
  
  
Line 37: Line 27:
  
  
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Application'']]
+
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Application'']]
  
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Construction Details'']]
+
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 19:03, 9 August 2016

File:8.1.4.5.1.jpg


1 WORK INCLUDED

(1) Valley Protection Membrane
Accepted self-adhered modified bituminous eave protection membrane.
(2) Underlayment
The type of underlay required is determined by roof slope.
(3) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(4) Valley Metal Panel
Preformed with centre rib and built-in continuous lock.
(5) Fastening
Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
(6) Membrane Strip-in
Accepted self-adhered modified bituminous eave protection membrane.
(7) Architectural Metal Roof Panel
(8) Continuous Built-In Hook Strip
(9) Valley Panel Overlap
Set in two continuous rows of accepted caulking or sealant tape.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.





Back to ASM Application

Back to ASM Construction Details

Back to Construction Details