Difference between revisions of "ASM Valley (Hooked)"

Jump to: navigation, search

Difference between revisions of "ASM Valley (Hooked)"

Line 1: Line 1:
 
<div class="col-md-6">
 
<div class="col-md-6">
<div class="panel panel-danger">
+
<div class="panel panel-primary">
 
<div class="panel-heading"><big></big></div>
 
<div class="panel-heading"><big></big></div>
 
<div class="panel-body">
 
<div class="panel-body">
Line 10: Line 10:
  
 
<div class="col-md-6">
 
<div class="col-md-6">
<div class="panel panel-danger">
+
<div class="panel panel-primary">
 
<div class="panel-heading"><big></big></div>
 
<div class="panel-heading"><big></big></div>
 
<div class="panel-body">
 
<div class="panel-body">

Revision as of 19:43, 9 August 2016

1 WORK INCLUDED

(1) Valley Protection Membrane
Accepted self-adhered modified bituminous eave protection membrane.
(2) Underlayment
The type of underlay required is determined by roof slope.
(3) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(4) Valley Metal Panel
Preformed with centre rib and built-in continuous lock.
(5) Fastening
Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
(6) Membrane Strip-in
Accepted self-adhered modified bituminous eave protection membrane.
(7) Architectural Metal Roof Panel
(8) Continuous Built-In Hook Strip
(9) Valley Panel Overlap
Set in two continuous rows of accepted caulking or sealant tape.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to ASM Application

Back to ASM Construction Details

Back to Construction Details