Difference between revisions of "ASM Valley (Hooked)"
Difference between revisions of "ASM Valley (Hooked)"
Line 4: | Line 4: | ||
<div class="panel-body"> | <div class="panel-body"> | ||
<div style="text-align:center"> | <div style="text-align:center"> | ||
− | [[File:8.1.4.5.1.jpg]] | + | [[File:8.1.4.5.1.jpg|500 px]] |
</div> | </div> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> |
Revision as of 19:52, 9 August 2016
1 WORK INCLUDED
- (1) Valley Protection Membrane
- Accepted self-adhered modified bituminous eave protection membrane.
- (2) Underlayment
- The type of underlay required is determined by roof slope.
- (3) Slip Sheet
- Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
- (4) Valley Metal Panel
- Preformed with centre rib and built-in continuous lock.
- (5) Fastening
- Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
- (6) Membrane Strip-in
- Accepted self-adhered modified bituminous eave protection membrane.
- (7) Architectural Metal Roof Panel
- (8) Continuous Built-In Hook Strip
- (9) Valley Panel Overlap
- Set in two continuous rows of accepted caulking or sealant tape.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.