Difference between revisions of "ASM 10.4.3 Ridge (Vented)"

Jump to: navigation, search

Difference between revisions of "ASM 10.4.3 Ridge (Vented)"

(WORK INCLUDED)
Line 7: Line 7:
 
;(7) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMPANEL |'''Architectural Metal Roof Panel''']] : Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.  
 
;(7) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMPANEL |'''Architectural Metal Roof Panel''']] : Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.  
 
;(4) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMCLIP|'''Metal Panel Clip''']]: Installed to metal roof panel manufacturer's printed instructions.  
 
;(4) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMCLIP|'''Metal Panel Clip''']]: Installed to metal roof panel manufacturer's printed instructions.  
;(5) ''''Z'-Bar Closure''': Set in accepted caulking and secured with compatible non-corrosive flat head fasteners.  
+
;(5) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMZ |''''Z' Closure''']]: Set in accepted caulking and secured with compatible non-corrosive flat head fasteners.  
 
;(6) '''Perforated Metal Screen'''  
 
;(6) '''Perforated Metal Screen'''  
 
;(7) '''Continuous Cleat'''
 
;(7) '''Continuous Cleat'''
 
;(8) '''Metal Cap Flashing''': Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under.
 
;(8) '''Metal Cap Flashing''': Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under.
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===

Revision as of 18:25, 10 August 2016

8.1.4.13.1.jpg


1 WORK INCLUDED

(1) Underlayment
The type of underlay required is determined by roof slope.
(2) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(7) Architectural Metal Roof Panel 
Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.
(4) Metal Panel Clip
Installed to metal roof panel manufacturer's printed instructions.
(5) 'Z' Closure
Set in accepted caulking and secured with compatible non-corrosive flat head fasteners.
(6) Perforated Metal Screen
(7) Continuous Cleat
(8) Metal Cap Flashing
Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wood Nailer
(C) Air Space
Determined by Design Authority.


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.