Difference between revisions of "SBS Curb for Multiple Penetrations"

Jump to: navigation, search

Difference between revisions of "SBS Curb for Multiple Penetrations"

(RELATED WORK BY OTHERS)
Line 1: Line 1:
[[File:10.3.5.3.jpg]]
+
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:10.3.5.3.jpg|class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
 +
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
 
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
 
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
Line 18: Line 26:
 
;(B) '''Air / Vapour Seal'''
 
;(B) '''Air / Vapour Seal'''
 
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSCURB|'''Wood Blocking/Curb''']]: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface.
 
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSCURB|'''Wood Blocking/Curb''']]: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface.
 
+
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
 
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.

Revision as of 18:06, 19 August 2016

SBS Details

10.3.5.3.jpg

1 WORK INCLUDED

(1) Gypsum Deck Overlay
If required by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
As required.
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing
Mechanically fasten to top of curb (C).
(7) Base Metal Flashing
Mechanically fasten to top of curb, standing seam at corners of cant, optional on flexible membrane systems. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
(8) Metal Counter Flashing
(9) Metal Hood

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Blocking/Curb
Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details