Difference between revisions of "SBS Curb for Multiple Penetrations"
Difference between revisions of "SBS Curb for Multiple Penetrations"
(→RELATED WORK BY OTHERS) |
|||
Line 1: | Line 1: | ||
− | [[File:10.3.5.3.jpg]] | + | <div class="panel panel-success"> |
+ | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:10.3.5.3.jpg|class=img-responsive]] | ||
+ | </div> | ||
+ | </div><!-- COL-MD-6 --> | ||
+ | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority. | ;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority. | ||
Line 18: | Line 26: | ||
;(B) '''Air / Vapour Seal''' | ;(B) '''Air / Vapour Seal''' | ||
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSCURB|'''Wood Blocking/Curb''']]: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface. | ;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSCURB|'''Wood Blocking/Curb''']]: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface. | ||
− | + | </div><!-- COL-6-MD --> | |
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. |
Revision as of 18:06, 19 August 2016
SBS Details
1 WORK INCLUDED
- (1) Gypsum Deck Overlay
- If required by design authority.
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay Board
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- Mechanically fasten to top of curb (C).
- (7) Base Metal Flashing
- Mechanically fasten to top of curb, standing seam at corners of cant, optional on flexible membrane systems. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Counter Flashing
- (9) Metal Hood
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Air / Vapour Seal
- (C) Wood Blocking/Curb
- Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.