Difference between revisions of "EPDM Conventionally Insulated System (Typical)"
Difference between revisions of "EPDM Conventionally Insulated System (Typical)"
Line 1: | Line 1: | ||
− | [[File:6.3.1.1.jpg]] | + | <div class="panel panel-success"> |
− | + | <div class="panel-heading"><big>'''EPDM Details'''</big></div> | |
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:6.3.1.1.jpg|class=img-responsive]] | ||
+ | </div> | ||
+ | </div><!-- COL-MD-6 --> | ||
+ | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
;1) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness or when required as a thermal barrier by design authority. | ;1) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness or when required as a thermal barrier by design authority. | ||
Line 18: | Line 25: | ||
;(B) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMWALLSUB|'''Acceptable Parapet Surface''']]: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer. | ;(B) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMWALLSUB|'''Acceptable Parapet Surface''']]: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer. | ||
;(C) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMWOODBLOCKING|'''Sloped Wood Blocking''']] | ;(C) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMWOODBLOCKING|'''Sloped Wood Blocking''']] | ||
− | + | </div><!-- COL-6-MD --> | |
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. |
Revision as of 18:16, 19 August 2016
EPDM Details
1 WORK INCLUDED
- 1) Gypsum Deck Overlay
- May be required depending on insulation thickness or when required as a thermal barrier by design authority.
- (2) Insulation
- Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (3) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (4) Adhesive
- Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
- (5) Membrane Flashing
- Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface.
- (6) Fasteners
- Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).
- (7) Membrane Lap
- EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive.
- (8) Metal Cap Flashing
- As required by the RoofStar Guarantee Standards.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Acceptable Parapet Surface
- Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
- (C) Sloped Wood Blocking
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.