<div class="panel-heading"><big>'''Waterproofing Details for Plazas, Promenades and Terraces'''</big></div>
 
+
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:9.6.7.jpg|class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
 +
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
  
Line 20: Line 26:
  
 
=== WORK BY OTHERS ===
 
=== WORK BY OTHERS ===
 
 
(A) <b>Acceptable Deck</b>: Concrete slab depicted.
 
(A) <b>Acceptable Deck</b>: Concrete slab depicted.
  
 
(B) <b>Wall Cladding and Flashing:</b>  
 
(B) <b>Wall Cladding and Flashing:</b>  
 +
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
NOTE: <b>Refer to<i> RGC Guarantee Standards E </i>for additional requirements.</b>
+
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
  
 
<hr>
 
<hr>
Line 31: Line 39:
  
  
[[Section:F. Application: Waterproofing Plazas, Promenades and Terraces|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Waterproofing Application'']]
 
  
[[Waterproofing Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Waterproofing Construction Details'']]
+
[[Section:F. Application: Waterproofing Plazas, Promenades and Terraces|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Waterproofing Application'']]
 +
 
 +
[[Waterproofing Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Waterproofing Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 21:43, 19 August 2016

Waterproofing Details for Plazas, Promenades and Terraces

9.6.7.jpg

1 WORK INCLUDED

(1)Primary Waterproofing Membrane: Fully adhered to acceptable substrates.

(2)Membrane Flashing: At walls membrane flashing must be carried up walls a minimum of 100mm (4") in height above the finished waterproofing assembly be it ballast, pavers or other permeable wearing course. At doorsill openings membrane flashing may be less than 100mm (4") in height above the finished waterproofing assembly but must not be less than 100mm (4") in height above the primary waterproofing membrane. Low doorsills shall incorporate a metal water stop flashing that is mechanically attached to the backside of doorsill framing or openings and is sealed with elastomeric or SBS membrane flashing. In addition, membrane flashing gussets must be installed at doorsill opening corners. For additional requirements refer to Section 2.1.1 Guarantee Standard A5

(3) Metal Base Flashing: Required on all waterproofing assemblies. Flashing lengths joined by use of S-locks or standing seam joints.

(4) Metal Counter Flashing: Extend behind wall finish (siding) minimum 50mm (2"). Flashing lengths joined by use of S-locks or standing seam joints.

(5) Metal Water Stop Flashing: Mechanically attached to inside of doorsill framing or opening. Cut flashing to fit opening and install membrane gussets at corners.

(6) Metal Pan Sill Flashing: Optional: Metal pan with water stop formed with pan folded, welded or soldered corners mechanically attached to inside of doorsill frame or opening and sealed with membrane flashing. (7) Protection Board/Mat: Proprietary membrane protection board or mat approved by membrane manufacture, compatible with waterproofing membrane system, and compliant with RGC Guarantee Standards E.


2 WORK BY OTHERS

(A) Acceptable Deck: Concrete slab depicted.

(B) Wall Cladding and Flashing:

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to Waterproofing Application

Back to Waterproofing Construction Details

Back to Construction Details