Difference between revisions of "LMF Metal Cap Flashing (joints)"

Jump to: navigation, search

Difference between revisions of "LMF Metal Cap Flashing (joints)"

Line 13: Line 13:
 
(1) <b>Expansion: </b>Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
 
(1) <b>Expansion: </b>Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
  
(2) <b>Underlayment:</b> Membrane under cap flashing. See <i>RGC Guarantee Standard A5.6</i>
+
(2) <b>Underlayment:</b> Membrane under cap flashing. See {{hilite | <i>RGC Guarantee Standard A5.6</i> || 2016-November-19 }}
  
 
(3) <b>Clips: </b>Standing seams are fastened to wood blocking before applying the following length, using nails and clips.
 
(3) <b>Clips: </b>Standing seams are fastened to wood blocking before applying the following length, using nails and clips.
Line 19: Line 19:
 
(4) <b>Fasteners: </b>S-locks and Double S-locks are nailed through the single leaf before applying the following length. See <i>RGC Guarantee Standard A6.8</i>
 
(4) <b>Fasteners: </b>S-locks and Double S-locks are nailed through the single leaf before applying the following length. See <i>RGC Guarantee Standard A6.8</i>
  
(5) <b>Metal Cap Flashing: </b>Fastened with continous concealed clips or cladding screws evenly spaced between seams. See <i>RGC Guarantee Standard A6.10 for requirements.</i>
+
(5) <b>Metal Cap Flashing: </b>Fastened with continous concealed clips or cladding screws evenly spaced between seams. See {{hilite | <i>RGC Guarantee Standard A6.10 || 2016-November-19 }} for requirements.</i>
  
 
*Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2
 
*Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2

Revision as of 21:57, 19 August 2016

Metal Flashing Details

10.2.1.jpg

END JOINTS in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:

(1) Expansion: Allowances should be made for expansion and contraction. Soldered joints are not acceptable.

(2) Underlayment: Membrane under cap flashing. See RGC Guarantee Standard A5.6

(3) Clips: Standing seams are fastened to wood blocking before applying the following length, using nails and clips.

(4) Fasteners: S-locks and Double S-locks are nailed through the single leaf before applying the following length. See RGC Guarantee Standard A6.8

(5) Metal Cap Flashing: Fastened with continous concealed clips or cladding screws evenly spaced between seams. See RGC Guarantee Standard A6.10 for requirements.

  • Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



Back to Metal Flashing Details

Back to Construction Details