Difference between revisions of "LMF Metal Cap Flashing (joints)"
Difference between revisions of "LMF Metal Cap Flashing (joints)"
Line 26: | Line 26: | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
+ | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | ||
+ | <hr> | ||
− | |||
− | |||
− | |||
− | |||
+ | [[Section:F. Application: Waterproofing Plazas, Promenades and Terraces|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Waterproofing Application'']] | ||
− | [[ | + | [[Waterproofing Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Waterproofing Construction Details'']] |
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 22:01, 19 August 2016
END JOINTS in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:
(1) Expansion: Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
(2) Underlayment: Membrane under cap flashing. See RGC Guarantee Standard A5.6
(3) Clips: Standing seams are fastened to wood blocking before applying the following length, using nails and clips.
(4) Fasteners: S-locks and Double S-locks are nailed through the single leaf before applying the following length. See RGC Guarantee Standard A6.8
(5) Metal Cap Flashing: Fastened with continous concealed clips or cladding screws evenly spaced between seams. See RGC Guarantee Standard A6.10 for requirements.
- Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to Waterproofing Application