Difference between revisions of "LMF Metal Cap Flashing (joints)"
Difference between revisions of "LMF Metal Cap Flashing (joints)"
Line 1: | Line 1: | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
− | <div class="panel-heading"><big>''' | + | <div class="panel-heading"><big>'''Waterproofing Details for Plazas, Promenades and Terraces'''</big></div> |
<div class="panel-body"> | <div class="panel-body"> | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
Line 17: | Line 17: | ||
(3) <b>Clips: </b>Standing seams are fastened to wood blocking before applying the following length, using nails and clips. | (3) <b>Clips: </b>Standing seams are fastened to wood blocking before applying the following length, using nails and clips. | ||
− | (4) <b>Fasteners: </b>S-locks and Double S-locks are nailed through the single leaf before applying the following length. See <i>RGC Guarantee Standard A6.8</i> | + | (4) <b>Fasteners: </b>S-locks and Double S-locks are nailed through the single leaf before applying the following length. See {{hilite | <i>RGC Guarantee Standard A6.8</i> || 2016-November-19 }} |
(5) <b>Metal Cap Flashing: </b>Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See {{hilite | <i>RGC Guarantee Standard A6.10 || 2016-November-19 }} for requirements.</i> | (5) <b>Metal Cap Flashing: </b>Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See {{hilite | <i>RGC Guarantee Standard A6.10 || 2016-November-19 }} for requirements.</i> | ||
*Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2. | *Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2. | ||
− | |||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> |
Revision as of 22:04, 19 August 2016
END JOINTS in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:
(1) Expansion: Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
(2) Underlayment: Membrane under cap flashing. See RGC Guarantee Standard A5.6
(3) Clips: Standing seams are fastened to wood blocking before applying the following length, using nails and clips.
(4) Fasteners: S-locks and Double S-locks are nailed through the single leaf before applying the following length. See RGC Guarantee Standard A6.8
(5) Metal Cap Flashing: Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See RGC Guarantee Standard A6.10 for requirements.
- Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to Waterproofing Application