Difference between revisions of "LMF Metal Cap Flashing (joints)"
Difference between revisions of "LMF Metal Cap Flashing (joints)"
Line 1: | Line 1: | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
− | <div class="panel-heading"><big>''' | + | <div class="panel-heading"><big>'''Metal Flashing Details'''</big></div> |
<div class="panel-body"> | <div class="panel-body"> | ||
<div class="col-md-6"> | <div class="col-md-6"> |
Revision as of 22:08, 19 August 2016
END JOINTS in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:
(1) Expansion: Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
(2) Underlayment: Membrane under cap flashing. See RGC Guarantee Standard A5.6
(3) Clips: Standing seams are fastened to wood blocking before applying the following length, using nails and clips.
(4) Fasteners: S-locks and Double S-locks are nailed through the single leaf before applying the following length. See RGC Guarantee Standard A6.8
(5) Metal Cap Flashing: Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See RGC Guarantee Standard A6.10 for requirements.
- Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to Waterproofing Application