Difference between revisions of "LMF Metal Cap Flashing (joints)"

Jump to: navigation, search

Difference between revisions of "LMF Metal Cap Flashing (joints)"

Line 33: Line 33:
  
  
 +
[[Metal Flashing Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Metal Flashing Details'']]
  
[[Section:F. Application: Waterproofing Plazas, Promenades and Terraces|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Waterproofing Application'']]
+
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 
 
[[Waterproofing Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Waterproofing Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 

Revision as of 22:09, 19 August 2016

Metal Flashing Details

10.2.1.jpg

END JOINTS in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:

(1) Expansion: Allowances should be made for expansion and contraction. Soldered joints are not acceptable.

(2) Underlayment: Membrane under cap flashing. See RGC Guarantee Standard A5.6

(3) Clips: Standing seams are fastened to wood blocking before applying the following length, using nails and clips.

(4) Fasteners: S-locks and Double S-locks are nailed through the single leaf before applying the following length. See RGC Guarantee Standard A6.8

(5) Metal Cap Flashing: Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See RGC Guarantee Standard A6.10 for requirements.

  • Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



Back to Metal Flashing Details

Back to Construction Details