Difference between revisions of "SBS Control Joint (Roof Divider)"
Difference between revisions of "SBS Control Joint (Roof Divider)"
Line 1: | Line 1: | ||
+ | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
+ | | colspan="2" | <big>To read '''''RoofStar Guarantee Standards''''' for any element in this illustration, click on the <span style="color:#6495ed">'''blue-linked'''</span> terms</big> | ||
+ | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
Line 34: | Line 37: | ||
<hr> | <hr> | ||
− | |||
− | |||
Revision as of 21:08, 25 August 2016
To read RoofStar Guarantee Standards for any element in this illustration, click on the blue-linked terms |
SBS Details
1 WORK INCLUDED
- (1) Gypsum Deck Overlay
- If required by design authority.
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay Board
- Where required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- Lap over top and mechanically fasten.
- (7) Base Metal Flashing
- Mechanically fasten to top of wood blocking. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Cap Flashing
- NOTE: (7) and (8) may be one piece.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Control Joint Assembly
- Required to separate new systems from existing roof systems and at dissimilar roof decks or on BUR assemblies over 45 m x 45 m (150’ x 150’). Primed where applicable. Slope top if wider than 100 mm (4").
- (C) Existing Roof Assembly
- If applicable. Prepared for application of membrane flashing at control joint.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.