Difference between revisions of "SBS Parapet-Wall Connection"
Difference between revisions of "SBS Parapet-Wall Connection"
Line 47: | Line 47: | ||
<hr> | <hr> | ||
− | |||
− | |||
Revision as of 21:20, 25 August 2016
To read RoofStar Guarantee Standards for any element in this illustration, click on the blue-linked terms |
SBS Details
1 WORK INCLUDED
- (1) Gypsum Deck Overlay
- If required by design authority.
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- See list of Accepted Materials.
- (4) Insulation Overlay Board
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing (attachment & termination)
- Mechanically fasten at terminations. At least one ply must extend over outside edge.
- (7) Metal Base Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Cap Flashing
- Must overlap exterior wall finish. Fasten with concealed clip-type fasteners or cladding screws evenly spaced between seams.
- (9) Wall Tie-in
- Minimum 2 mm (0.078") self-adhered modified bitumen or flexible membrane manufacturers approved detail.
- (10) Metal Counter-flashing
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Air/Vapour Seal
- (C) Acceptable Wall Surface
- (D) Wood Blocking
- (E) Sloped Wood Blocking
- Required over 100 mm (4") parapet width.
- (F) Wall Sheathing Membrane
- Minimum 1 mm (0.040") self-adhered modified bitumen.
- (G) Wall Cladding
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.