Difference between revisions of "SBS Structural Planter"
Difference between revisions of "SBS Structural Planter"
(→WORK INCLUDED) |
|||
Line 2: | Line 2: | ||
| colspan="2" | <big>To read '''''RoofStar Guarantee Standards''''' for any element in this illustration, click on the <span style="color:#6495ed">'''blue-linked'''</span> terms</big> | | colspan="2" | <big>To read '''''RoofStar Guarantee Standards''''' for any element in this illustration, click on the <span style="color:#6495ed">'''blue-linked'''</span> terms</big> | ||
|} | |} | ||
− | + | <div class="panel panel-success"> | |
− | + | <div class="panel-heading"><big>'''SBS Details'''</big></div> | |
− | [[File:D1.7. | + | <div class="panel-body"> |
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:D1.7.24 (View 1).jpg|class=img-responsive]] | ||
+ | [[File:D1.7.24 (View 2).jpg|class=img-responsive]] | ||
+ | </div> | ||
+ | </div><!-- COL-MD-6 --> | ||
+ | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
;(1) '''Primer''': Application method and coverage rate as approved by Primary Membrane Manufacturer. | ;(1) '''Primer''': Application method and coverage rate as approved by Primary Membrane Manufacturer. | ||
Line 25: | Line 32: | ||
;(E) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Reglet''']]: Premanufactured purpose-made reglet cast in concrete wall or saw-cut. | ;(E) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Reglet''']]: Premanufactured purpose-made reglet cast in concrete wall or saw-cut. | ||
;(F) '''Alternate Termination''': Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls. | ;(F) '''Alternate Termination''': Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls. | ||
− | + | </div><!-- COL-6-MD --> | |
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. |
Revision as of 17:11, 26 August 2016
To read RoofStar Guarantee Standards for any element in this illustration, click on the blue-linked terms |
SBS Details
1 WORK INCLUDED
- (1) Primer
- Application method and coverage rate as approved by Primary Membrane Manufacturer.
- (5) Primary Roof Membrane
- Modified Bituminous base and cap sheet membranes installed as per manufacturer's published application specifications.
- (3) Pre-Curb (Start-Up Curb) Membrane Flashing
- Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer's published application specifications.
- (4) Proprietary Liquid Membrane Flashing
- RoofStar Guarantee Program accepted Liquid Membrane Flashing System(s) or hot melt SBS modified bitumen. Install as per the Manufacturer's published instructions.
- (5) Inside Planter Wall Membrane Flashing
- Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch-applied membrane. Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6").
- (6) Reglet - Metal Counter Flashing
- As required by the RoofStar Guarantee Standards.
- (7) Plaza Deck / Planter Interior Assembly
- Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- Concrete slab shown. Each planter area must have a drain through the roof deck.
- (B) Pre-Curb
- Minimum of 100mm (4") in height above concrete deck, smooth dry and clean.
- (C) Cast over Concrete Planter Wall
- Form on top of membrane sealed Pre-curbs or Start-up curbs.
- (D) Re-Bar
- Placed a centre of Pre-curb.
- (E) Reglet
- Premanufactured purpose-made reglet cast in concrete wall or saw-cut.
- (F) Alternate Termination
- Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.