Difference between revisions of "SBS Equipment Sleeper"
Difference between revisions of "SBS Equipment Sleeper"
Line 1: | Line 1: | ||
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
− | | colspan="2" | <big> | + | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> |
|} | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> |
Revision as of 21:12, 26 August 2016
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Gypsum Deck Overlay
- If required by design authority.
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay Board
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- Lap one ply from each side over top of sleeper (C) and mechanically fasten.
- (7) Alternate Cap Flashing
- May be used instead of lapping membrane flashing over sleeper.
- (8) Metal Base Flashing
- Mechanically fasten to top of wood blocking, standing seam at corners, optional on flexible membrane systems. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (9) Metal Cap Flashing
- NOTE: (8) and (9) may be one piece.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Air / Vapour Seal
- (C) Wood Blocking/Sleeper
- Minimum 150 mm (6") thick, minimum 100 mm (4") above finished roof surface.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.