Difference between revisions of "ASM Valley (Unhooked)"
Difference between revisions of "ASM Valley (Unhooked)"
Line 1: | Line 1: | ||
+ | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
+ | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | ||
+ | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''ASM Details'''</big></div> | <div class="panel-heading"><big>'''ASM Details'''</big></div> |
Revision as of 15:01, 1 September 2016
RoofStar Guarantee Standards are blue-linked |
ASM Details
1 WORK INCLUDED
- (1) Valley Protection Membrane
- Accepted self-adhered modified bituminous eave protection membrane.
- (2) Underlayment
- The type of underlay required is determined by roof slope.
- (3) Slip Sheet
- Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
- (4) Valley Metal Panel
- Preformed with centre rib.
- (5) Metal Panel Clip
- Installed to metal roof panel manufacturer's printed instructions.
- (6) Pre-formed Closures
- Two rows set in accepted caulking.
- (7) Architectural Metal Roof Panel
- (8) Valley Panel Overlap
- Overlaps minimum 200 mm (8") sealed with two rows of accepted caulking and drag load fasteners.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.