Difference between revisions of "TS Details:E4.7.6 (Tile - Wood Batten Construction)"
Difference between revisions of "TS Details:E4.7.6 (Tile - Wood Batten Construction)"
Line 1: | Line 1: | ||
− | + | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | |
+ | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | ||
+ | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''Tile Roofing Details'''</big></div> | <div class="panel-heading"><big>'''Tile Roofing Details'''</big></div> |
Revision as of 15:18, 1 September 2016
RoofStar Guarantee Standards are blue-linked |
1 WORK INCLUDED
(1) Underlayment: RGC Accepted eave protection / underlayment installed perpendicular to the slope with 50 mm (2") minimum side laps and 100 mm (4") minimum end laps.
(2) Wood Battens or Strapping: Treated battens minimum 38 mm x 38 mm (1.5" x 1.5") or lath strapping minimum 12.7 mm x 38 mm (0.5" x 1.5") installed under horizontal battens using non-corrosive fasteners over underlay to provide unobstructed drainage. Install parallel to slope in line with roof structure supports beneath sheathing.
(3) Wood Battens (Purlins): Treated battens 38 mm x 38 mm (1.5" x 1.5") applied over batten or strapping using non-corrosive fasteners. Install perpendicular to slope, spacing determined by manufacturers specification.
(4) Metal Facia: Shop built or manufacturers accepted proprietary eave flashing installed to cover open space between furring battens at facia.
2 RELATED WORK BY OTHERS
(A) Acceptable Deck
NOTE:
- Refer to RGC Guarantee Standards for additional requirements.