Difference between revisions of "WP Details:F1.7.9 (Walls - Reglet & Counter-Flashings)"
Difference between revisions of "WP Details:F1.7.9 (Walls - Reglet & Counter-Flashings)"
(→WORK INCLUDED) |
|||
Line 1: | Line 1: | ||
+ | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
+ | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | ||
+ | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''Waterproofing Details for Plazas, Promenades and Terraces'''</big></div> | <div class="panel-heading"><big>'''Waterproofing Details for Plazas, Promenades and Terraces'''</big></div> | ||
Line 10: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | (1) <b>Primary Waterproofing Membrane: </b>Fully adhered to acceptable substrates (concrete slab depicted), installed as per | + | (1) <b>Primary Waterproofing Membrane: </b>Fully adhered to acceptable substrates (concrete slab depicted), installed as per [[RoofStar Guarantee Standards for Waterproofing|'''RoofStar Guarantee Standards for Waterproofing Plazas, Promenades & Terraces''']] and Membrane Manufacturer's installation specifications. |
(2) <b> Membrane Flashing (stripping): </b>Carried up walls a minimum 200 mm (8") above membrane surface (Deck) and a minimum of 100mm (4") above top surface of permeable waterproofing wearing surfaces and overburdens. | (2) <b> Membrane Flashing (stripping): </b>Carried up walls a minimum 200 mm (8") above membrane surface (Deck) and a minimum of 100mm (4") above top surface of permeable waterproofing wearing surfaces and overburdens. |
Revision as of 16:21, 1 September 2016
RoofStar Guarantee Standards are blue-linked |
1 WORK INCLUDED
(1) Primary Waterproofing Membrane: Fully adhered to acceptable substrates (concrete slab depicted), installed as per RoofStar Guarantee Standards for Waterproofing Plazas, Promenades & Terraces and Membrane Manufacturer's installation specifications.
(2) Membrane Flashing (stripping): Carried up walls a minimum 200 mm (8") above membrane surface (Deck) and a minimum of 100mm (4") above top surface of permeable waterproofing wearing surfaces and overburdens.
(3) Membrane Primer or Adhesive: proprietary primer or adhesive, application and quantities as directed by membrane manufacturers published application specifications.
(4) Metal Base Flashing: Required on all waterproofing assemblies flashing lengths joined by use of S-locks or standing seam joints.
(5) Metal Counter Flashing: Set in reglet fastened with expanding type concrete pins, join flashing lengths by use of S-locks or standing seam joints.
(6) Fasteners: Suitable expanding type concrete pins.
(7) Caulking: Polyurethane sealant, fill void and tool smooth.
2 RELATED WORK BY OTHERS
(A)Concrete Wall: Must be dry, smooth and primed for membrane flashing to be adhered directly. (Plywood or fibre-mat reinforced cement board may be required).
(B)Reglet: minimum 75mm (3/4") in depth, saw cut or manufactured preformed reglet.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to Waterproofing Application