Difference between revisions of "SBS 2-Part Retrofit Flashing (Cable Penetration)"

Jump to: navigation, search

Difference between revisions of "SBS 2-Part Retrofit Flashing (Cable Penetration)"

(No difference)

Revision as of 18:15, 16 September 2016

RoofStar Guarantee Standards are blue-linked
SBS Details

D1.7.7-2.jpg

1 WORK INCLUDED

(1) Gypsum Deck Overlay
Required when insulation is too thin to span flutes of steel decking or as thermal barrier when specified by the design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
Mechanically fastened where possible. See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
As required.
(5) Base Sheet
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to RoofStar Guarantee Standards. Torching directly to wood surfaces is not permitted.
(6) Mastic
Compatible with membrane
(7) Base Sheet Flashing
Adhered according to manufacturer's specifications, using cold adhesive, self-adhered or torch applied. Must be carried up flashing and terminate under hood flange. Torching directly to wood surfaces is not permitted.
(8) Cap Sheet
Applied according to manufacturer's printed instructions and to RoofStar Guarantee Standards.
(9) Cap Sheet Flashing
Applied according to manufacturer's printed instructions and to RoofStar Guarantee Standards. Must be carried up flashing and terminate under hood flange.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wood Blocking
(C) Two Piece Flashing
Assembled around protrusion, laid in bed of compatible mastic on top of base sheet. Mechanically fasten two components together and fasten flange to wood blocking or deck.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to SBS Application

Back to SBS Construction Details

Back to Construction Details