Difference between revisions of "TS Details:E4.7.13 (Tile/Slate - Guilt-in Gutters)"
Difference between revisions of "TS Details:E4.7.13 (Tile/Slate - Guilt-in Gutters)"
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | {{Template:RPM Info}} | ||
+ | |||
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>TS Details:E4.7.13 (Tile/Slate - Guilt-in Gutters)</big></big></big></big></big> | ||
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
− | | colspan="2" | <big>''''' | + | | colspan="2" | <big>'''''Notice to Reader'''''</big> |
+ | |- | ||
+ | | style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[Slate Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span> | ||
|} | |} | ||
+ | |||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''Slate Roofing Details'''</big></div> | <div class="panel-heading"><big>'''Slate Roofing Details'''</big></div> | ||
Line 7: | Line 18: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:8.3.1.jpg|class=img-responsive]] | + | [[File:8.3.1.jpg| link=http://rpm.rcabc.org/images/d/d7/8.3.1.jpg| class=img-responsive]] |
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 13: | Line 24: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | + | ;(1) MEMBRANES: Membranes must be installed to the Standard and the manufacturer's printed instructions | |
− | (1) | + | ;(2) ADHESION: Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c |
− | + | ;(3) HEIGHT: The minimum vertical sealed height above the maximum water level is 150 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions. | |
− | (2) | + | ;(4) EAVE PROTECTION: Built-in gutter membranes can be extended to act as an eave protection membrane. Underlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 200 mm (8") and be installed in shingle fashion (not shown for clarity). |
− | |||
− | (3) | ||
− | |||
− | (4) | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | + | ;(A) DIMENSIONS: Dimensions of parapets, cants and water loading of gutters are variable and should be determined by design authority | |
− | (A) | + | ;(B) ACCEPTABLE DECK: |
− | |||
− | (B) | ||
NOTE: <b>*</b> Refer to <i>RGC Guarantee Standards</i> for additional requirements. | NOTE: <b>*</b> Refer to <i>RGC Guarantee Standards</i> for additional requirements. | ||
Line 34: | Line 39: | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | |||
+ | '''NOTE''': See the [[Slate Systems Standard | '''Standard''']] for additional requirements. | ||
+ | <hr> | ||
− | [[ | + | [[Slate System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Slate System Details'']] |
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 21:12, 7 September 2021
Division D - Construction Details
TS Details:E4.7.13 (Tile/Slate - Guilt-in Gutters)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks |
Slate Roofing Details
1 WORK INCLUDED
- (1) MEMBRANES
- Membranes must be installed to the Standard and the manufacturer's printed instructions
- (2) ADHESION
- Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c
- (3) HEIGHT
- The minimum vertical sealed height above the maximum water level is 150 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions.
- (4) EAVE PROTECTION
- Built-in gutter membranes can be extended to act as an eave protection membrane. Underlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 200 mm (8") and be installed in shingle fashion (not shown for clarity).
2 RELATED WORK BY OTHERS
- (A) DIMENSIONS
- Dimensions of parapets, cants and water loading of gutters are variable and should be determined by design authority
- (B) ACCEPTABLE DECK
NOTE: * Refer to RGC Guarantee Standards for additional requirements.
NOTE: See the Standard for additional requirements.
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.