Difference between revisions of "SBS Structural Planter"

Jump to: navigation, search

Difference between revisions of "SBS Structural Planter"

 
(18 intermediate revisions by the same user not shown)
Line 1: Line 1:
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
{{Template:RPM Info}}
| colspan="2| <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
 
|}
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>SBS | Structural Planter ([[SBS_Roof_Systems_Standard#14.3.2.7._Structures_and_Equipment | Article 14.3.2.7.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
Line 7: Line 13:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:D1.7.6-5 (1).jpg|class=img-responsive]]
+
[[File:D1.7.6-5 (1).jpg| link=http://rpm.rcabc.org/images/5/51/D1.7.6-5_%281%29.jpg | class=img-responsive]]
  
[[File:D1.7.6-5 (2).jpg|class=img-responsive]]
+
[[File:D1.7.6-5 (2).jpg| link=http://rpm.rcabc.org/images/c/ca/D1.7.6-5_%282%29.jpg | class=img-responsive]]
 
</div>
 
</div>
 
 
 
::Click below for a printable version of this page.
 
 
<div style="width:150px; text-align: left;">
 
:[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/7/7e/D1.7.6-5_Print_Sheet.pdf|'''Print Sheet''']]
 
</div>
 
 
  
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
Line 26: Line 23:
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
 
;(1)  '''Primer''': Application method and coverage rate as approved by Primary Membrane Manufacturer.
 
;(1)  '''Primer''': Application method and coverage rate as approved by Primary Membrane Manufacturer.
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Primary Roof Membrane''']]: Modified Bituminous base and cap sheet membranes installed as per manufacturer's published application specifications.  
+
;(2) [[SBS Roof Systems Standard#PART_9|'''Primary Roof Membrane''']]: Modified Bituminous base and cap sheet membranes installed as per manufacturer's published application specifications.  
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPRECURB|'''Pre-Curb (Start-Up Curb) Membrane Flashing''']]: Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer's published application specifications.  
+
;(3) [[SBS Roof Systems Standard#PART_14|'''Pre-Curb (Start-Up Curb) Membrane Flashing''']]: Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer's published application specifications.  
;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSLIQUID|'''Proprietary Liquid Membrane Flashing''']]: RoofStar Guarantee Program accepted Liquid Membrane Flashing System(s) or hot melt SBS modified bitumen. (NOTE: Refer to [[Flexible Membrane Roofing Systems: Liquid Membrane Flashing Systems|'''Liquid Membrane Flashing Systems''']] in the Accepted Materials section of this Manual). Install as per Manufacturer's published instructions.
+
;(4) [[SBS Roof Systems Standard#PART_10|'''Proprietary Liquid Membrane Flashing''']]: RoofStar Guarantee Program accepted Liquid Membrane Flashing System(s) or hot melt SBS modified bitumen. (NOTE: Refer to '''Liquid Membrane Flashing Systems''' in Division C of this Manual). Install as per Manufacturer's published instructions.
;(5)  [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Inside Planter Wall Membrane Flashing''']]: Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch-applied membrane.  Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6").
+
;(5)  [[SBS Roof Systems Standard#PART_14|'''Inside Planter Wall Membrane Flashing''']]: Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch-applied membrane.  Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6").
;(6)  [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Reglet - Metal Counter Flashing''']]: As required by the ''RoofStar Guarantee Standards''.  Note that a coping flashing may be paired with the reglet flashing, as illustrated.
+
;(6)  [[SBS Roof Systems Standard#PART_13|'''Reglet - Metal Counter Flashing''']]: As required by the ''RoofStar Guarantee Standards''.  Note that a coping flashing may be paired with the reglet flashing, as illustrated.
 
;(7)  '''Plaza Deck / Planter Interior Assembly''': Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls.
 
;(7)  '''Plaza Deck / Planter Interior Assembly''': Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls.
  
Line 36: Line 33:
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Deck''']]: Concrete slab shown. Each planter area must have a drain through the roof deck.
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']]: Concrete slab shown. Each planter area must have a drain through the roof deck.
 
;(B) '''Pre-Curb''': Minimum of 100mm (4") in height above concrete deck, smooth dry and clean.  
 
;(B) '''Pre-Curb''': Minimum of 100mm (4") in height above concrete deck, smooth dry and clean.  
 
;(C) '''Cast over Concrete Planter Wall''': Form on top of membrane sealed Pre-curbs or Start-up curbs.
 
;(C) '''Cast over Concrete Planter Wall''': Form on top of membrane sealed Pre-curbs or Start-up curbs.
;(D) '''Re-Bar''': Placed a centre of Pre-curb.
+
;(D) '''Re-Bar''': Placed at centre of Pre-curb.
;(E) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Reglet''']]: Premanufactured purpose-made reglet cast in concrete wall or saw-cut.  
+
;(E) [[SBS Roof Systems Standard#PART_13|'''Reglet''']]: Premanufactured purpose-made reglet cast in concrete wall or saw-cut.  
 
;(F) '''Alternate Termination''': Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls.
 
;(F) '''Alternate Termination''': Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls.
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
Line 46: Line 43:
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements.
 
 
  
 
<hr>
 
<hr>
  
 +
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
[[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
 
[[SBS Modified Bitumen Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
 
  
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 18:21, 27 October 2023



Division D - Construction Details


SBS | Structural Planter ( Article 14.3.2.7.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

D1.7.6-5 (1).jpg

D1.7.6-5 (2).jpg

1 WORK INCLUDED

(1) Primer
Application method and coverage rate as approved by Primary Membrane Manufacturer.
(2) Primary Roof Membrane
Modified Bituminous base and cap sheet membranes installed as per manufacturer's published application specifications.
(3) Pre-Curb (Start-Up Curb) Membrane Flashing
Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer's published application specifications.
(4) Proprietary Liquid Membrane Flashing
RoofStar Guarantee Program accepted Liquid Membrane Flashing System(s) or hot melt SBS modified bitumen. (NOTE: Refer to Liquid Membrane Flashing Systems in Division C of this Manual). Install as per Manufacturer's published instructions.
(5) Inside Planter Wall Membrane Flashing
Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch-applied membrane. Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6").
(6) Reglet - Metal Counter Flashing
As required by the RoofStar Guarantee Standards. Note that a coping flashing may be paired with the reglet flashing, as illustrated.
(7) Plaza Deck / Planter Interior Assembly
Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
Concrete slab shown. Each planter area must have a drain through the roof deck.
(B) Pre-Curb
Minimum of 100mm (4") in height above concrete deck, smooth dry and clean.
(C) Cast over Concrete Planter Wall
Form on top of membrane sealed Pre-curbs or Start-up curbs.
(D) Re-Bar
Placed at centre of Pre-curb.
(E) Reglet
Premanufactured purpose-made reglet cast in concrete wall or saw-cut.
(F) Alternate Termination
Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.