Difference between revisions of "PVC Roof System Details"
Difference between revisions of "PVC Roof System Details"
(→Part 10 - Perimeters and Walls) |
|||
(20 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | { | + | {{Template:RPM Info}} |
− | |||
− | |||
− | |||
− | |||
− | |||
− | : | + | __NONUMBEREDHEADINGS__ |
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
− | : | + | :<big><big>Division D - Construction Details</big></big> |
+ | :<hr> | ||
+ | :<big><big><big><big><big>Construction Details for PVC Membrane Roof Systems</big></big></big></big></big> | ||
− | <div | + | <div class="col-md-2"> |
− | :[[File: | + | :[[File:PVC Thumbnail.jpg| link=http://rpm.rcabc.org/images/b/b8/PVC_Thumbnail.jpg|175 px]] |
</div> | </div> | ||
+ | |||
+ | <div class="col-md-10"> | ||
+ | :The drawings linked on this page are intended to represent a variety of PVC Membrane roof system applications while remaining generic with regards to ''manufacturer's'' specific application specifications. They do not represent all possible ''manufacturer'' application roof system designs. Consult each ''manufacturer's'' specifications and the '''''RoofStar Guarantee Standards''''' to develop a system acceptable to both the manufacturer and the '''''RoofStar Guarantee Program'''''. | ||
+ | |||
+ | :For further information about PVC Membrane System designs and requirements, see the '''[https://rpm.rcabc.org/index.php?title=PVC_Roof_Systems_Standard Standard for PVC Membrane Roof Systems]'''. | ||
+ | </div> | ||
+ | |||
<div class="col-md-12"> | <div class="col-md-12"> | ||
− | |||
− | |||
</div> | </div> | ||
− | + | <div class="col-md-4"> | |
− | |||
− | <div class="col-md- | ||
<hr> | <hr> | ||
+ | ===Part 1 - General=== | ||
+ | ====='''Permitted Roof Systems''' ([[PVC_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])===== | ||
+ | <ol> | ||
+ | <li>[[PVC Conventionally Insulated System (Typical)| Conventionally Insulated System (Typical)]] | ||
+ | <li>[[PVC Conventionally Insulated System (Alternate) | Conventionally Insulated System (Alternate)]] | ||
+ | <li>[[PVC Protected Roof Assembly (Typical) | Protected Roof Assembly (Typical)]] | ||
+ | </li></ol> | ||
− | + | ===Part 6 - Air and Vapour Controls=== | |
− | + | ====='''Continuity and Support''' ([[TPO_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])===== | |
− | + | <ol> | |
− | + | <li>[[PVC Air and Vapour Controls (Field) | {{hilite | Air and Vapour Controls (Field)|| 2021-February-7 }}]] | |
+ | </li></ol> | ||
− | |||
− | + | </div> | |
− | + | <div class="col-md-4"> | |
− | < | + | <hr> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | < | + | ===Part 10 - Perimeters and Walls=== |
+ | ====='''General Application''' ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])===== | ||
+ | <ol> | ||
+ | <li>[[PVC Membrane Termination A | Membrane Termination A]] | ||
+ | <li>[[PVC Membrane Termination B | Membrane Termination B]] | ||
+ | <li>[[PVC Membrane Termination C | Membrane Termination C]] | ||
+ | <li>[[PVC Membrane Termination D | Membrane Termination D]] | ||
+ | <li>[[PVC Membrane Termination E | Membrane Termination E]] | ||
+ | <li>[[PVC Membrane Termination F | Membrane Termination F]] | ||
+ | </li></ol> | ||
− | + | ===Part 11 - Drainage=== | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</div> | </div> | ||
− | <div class="col-md- | + | <div class="col-md-4"> |
<hr> | <hr> | ||
− | + | ===Part 12 - Penetrations and Curbs=== | |
− | |||
− | |||
− | |||
− | |||
− | + | ===Part 13 - Linear Metal Flashing=== | |
− | :[[ | + | :See the separate page, [[Linear_Metal_Flashing_Details | Construction Details for Linear Metal Flashings]]. |
− | |||
− | + | ===Part 14 - The Roof as a Platform=== | |
− | |||
− | |||
− | |||
− | |||
− | + | </div> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<div class="col-md-12"> | <div class="col-md-12"> | ||
+ | <hr> | ||
+ | [[PVC Roof Systems Standard|<i class="fa fa-chevron-circle-left" ></i> ''Standard for PVC Membrane Roof Systems'']] | ||
− | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] | |
− | [[ | + | {{Template:RPM Page Footer with Copyright and Current Date}} |
− | |||
− | |||
</div> | </div> |
Latest revision as of 16:44, 26 February 2024
- Division D - Construction Details
- Construction Details for PVC Membrane Roof Systems
- The drawings linked on this page are intended to represent a variety of PVC Membrane roof system applications while remaining generic with regards to manufacturer's specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
- For further information about PVC Membrane System designs and requirements, see the Standard for PVC Membrane Roof Systems.
Part 1 - General
Permitted Roof Systems ( Article 1.1.3.1.)
- Conventionally Insulated System (Typical)
- Conventionally Insulated System (Alternate)
- Protected Roof Assembly (Typical)
Part 6 - Air and Vapour Controls
Continuity and Support ( Article 6.3.2.1.)
Part 10 - Perimeters and Walls
General Application ( Article 10.3.2.3.)
- Membrane Termination A
- Membrane Termination B
- Membrane Termination C
- Membrane Termination D
- Membrane Termination E
- Membrane Termination F
Part 11 - Drainage
Part 12 - Penetrations and Curbs
Part 13 - Linear Metal Flashing
- See the separate page, Construction Details for Linear Metal Flashings.
Part 14 - The Roof as a Platform
Standard for PVC Membrane Roof Systems
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.