Difference between revisions of "EPDM Air and Vapour Controls (Field)"
Difference between revisions of "EPDM Air and Vapour Controls (Field)"
(→RELATED WORK BY OTHERS) |
|||
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | { | + | {{Template:RPM Info}} |
− | + | ||
− | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | |
− | + | __NOTOC__ | |
− | + | ||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>EPDM | Air and Vapour Controls (Field) ([[EPDM_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''EPDM Details'''</big></div> | <div class="panel-heading"><big>'''EPDM Details'''</big></div> | ||
Line 9: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File: | + | [[File:Figure 6.3.1-1.jpg|class=img-responsive | link=https://rpm.rcabc.org/images/5/54/Figure_6.3.1-1.jpg]] |
<br> | <br> | ||
<div class="col-md-8"> | <div class="col-md-8"> | ||
− | [[File: | + | [[File:Figure 6.3.1-2.jpg|class=img-responsive | link=https://rpm.rcabc.org/images/d/d0/Figure_6.3.1-2.jpg]] |
</div> | </div> | ||
</div> | </div> | ||
Line 27: | Line 31: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[EPDM Roof Systems Standard#PART_5 |'''Supporting Deck Overlay''']]: Recommended over steel decks, to provide continuous support for membrane control layers (this fulfills the requirement for continuity, ''British Columbia Building Code'', Div. B, '''5.4.1.2''' ('''3''')). |
− | ;(2) [[ | + | ;(2) [[EPDM Roof Systems Standard#PART_6 |'''Air or Vapour Controls''']]: Self-adhering membrane (typical). |
− | ;(3) [[ | + | ;(3) [[EPDM Roof Systems Standard#PART_6 |'''Metal Support''']]: For fully or intermittently unsupported side or end laps. Use pre-finished galvanized steel (min. 24 Ga.), fabricated at least 100 mm (4”) wider than membrane overlaps, and secured with compatible flat-head fasteners (two fasteners per flute, or as otherwise specified). |
− | ;(4) [[ | + | ;(4) [[EPDM Roof Systems Standard#PART_6 |'''Long edges (side laps)''']]:Centre membrane runs along top flutes of steel deck (applicable when no deck overlay is specified and installed). Overlap membrane side laps at least 50 mm (2”), or as specified by the membrane manufacturer (whichever is greater). Side laps must be fully supported by the roof deck or a metal support. |
− | + | ;(5) [[EPDM Roof Systems Standard#PART_6 |'''End laps''']]:Overlap the roll ends at least 100 mm (4”), or as specified by the membrane manufacturer (whichever is greater). End laps must be fully supported by the roof deck or a metal support. | |
− | ;( | ||
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) '''Acceptable Deck''' | + | ;(A) [[EPDM Roof Systems Standard#PART_2 |'''Acceptable Deck''']] |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[EPDM Roof Systems Standard | '''Standard''']] for additional requirements. |
− | |||
<hr> | <hr> | ||
+ | [[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']] | ||
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | |||
− | |||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 21:55, 27 June 2022
Division D - Construction Details
EPDM | Air and Vapour Controls (Field) ( Article 6.3.2.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
EPDM Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- Recommended over steel decks, to provide continuous support for membrane control layers (this fulfills the requirement for continuity, British Columbia Building Code, Div. B, 5.4.1.2 (3)).
- (2) Air or Vapour Controls
- Self-adhering membrane (typical).
- (3) Metal Support
- For fully or intermittently unsupported side or end laps. Use pre-finished galvanized steel (min. 24 Ga.), fabricated at least 100 mm (4”) wider than membrane overlaps, and secured with compatible flat-head fasteners (two fasteners per flute, or as otherwise specified).
- (4) Long edges (side laps)
- Centre membrane runs along top flutes of steel deck (applicable when no deck overlay is specified and installed). Overlap membrane side laps at least 50 mm (2”), or as specified by the membrane manufacturer (whichever is greater). Side laps must be fully supported by the roof deck or a metal support.
- (5) End laps
- Overlap the roll ends at least 100 mm (4”), or as specified by the membrane manufacturer (whichever is greater). End laps must be fully supported by the roof deck or a metal support.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: See the Standard for additional requirements.
Back to EPDM Construction Details
© RCABC 2024