Difference between revisions of "Miscellaneous wordings 1"

Jump to: navigation, search

Difference between revisions of "Miscellaneous wordings 1"

 
(194 intermediate revisions by the same user not shown)
Line 1: Line 1:
<li>An Integrity Scan
+
<html>
<ol>
+
<title>Effective R-value Calculator</title>
<li>must be performed by an RGC-recognized service provider {{hilite | listed in this ''Manual'' || 2021-October-30 }}.
+
<body>
<li>is required on all ''Waterproofing Systems'', to ensure the waterproofing is leak and damage-free, when ''Overburdens'', amenities or equipment are or will be installed on the completed ''Waterproofing System'' by
+
<iframe width="700" height="900" frameborder="0" scrolling="no" src="https://rcabc-my.sharepoint.com/personal/jklassen_rcabc_org/_layouts/15/Doc.aspx?sourcedoc={27df5aa9-9b8a-4011-993f-12323c0aa896}&action=embedview&wdAllowInteractivity=False&AllowTyping=True&ActiveCell='Sheet1'!D6&Item='Sheet1'!A1%3AL46&wdHideGridlines=True&wdInConfigurator=True"></iframe>
<ol>
+
</body>
<li>anyone other than the ''Contractor''.
+
</html>
<li>the ''Contractor'' but only when
 
<ol>
 
<li>{{hilite | the total ''Project'' area (footprint), inclusive of planters or other waterproofed features, exceeds 18.58 m2 (200 sf), and || 2021-October-30 }}
 
<li>the ''Overburdens'', amenities or equipment exceed 150 mm (6”) in depth.
 
</li></ol>
 
<li>is not required when the ''Contractor'' installs overburden, amenities or equipment
 
<ol>
 
<li>equal to or less than 150 mm (6”) in depth.
 
<li>{{hilite | the total ''Project'' area (footprint), inclusive of planters or other waterproofed features, is less than 18.58 m2 (200 sf), but the ''Contractor'' must nevertheless protect all membrane-covered surfaces (including walls and parapets) with RoofStar-accepted protection materials immediately after the membrane is installed || 2021-October-30 }}.
 
</li></ol>
 
</li></ol>
 
<br>
 
See '''Figure 1.1''' for further reference.
 

Latest revision as of 21:47, 19 May 2021

Effective R-value Calculator