Difference between revisions of "SBS Parapet (Independent of Roof Structure)"
Difference between revisions of "SBS Parapet (Independent of Roof Structure)"
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Template:RPM Info}} | {{Template:RPM Info}} | ||
− | { | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} |
− | | | + | __NOTOC__ |
− | + | ||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>SBS | Parapet (Independent of Roof Structure) ([[SBS_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
Line 12: | Line 16: | ||
</div> | </div> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[SBS Roof Systems Standard#PART_2|'''Supporting Deck Overlay''']] |
− | ;(2) [[ | + | ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority. |
− | ;(3) [[ | + | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']] |
− | ;(4) [[ | + | ;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: As required. |
− | ;(5) [[ | + | ;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTION| '''Membrane Protection''']] |
− | ;(6) [[ | + | ;(6) [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Mechanically fasten to outside face of parapet blocking (F). Do not mop outside edge. At least one ply must extend over outside edge. |
− | ;(7) [[ | + | ;(7) [[SBS Roof Systems Standard#PART_13|'''Metal Base Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See '''Section 13.6 - Cap Flashings, Base Flashings and Reglets'''. |
− | ;(8) [[ | + | ;(8) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']]: Flashings 7 and 8 may be one piece. See Section 14. Fasten with continuous concealed clip-type fasteners <b>or</b> cladding screws evenly spaced between seams. See '''Section 13.3 - Attachment'''. |
<hr> | <hr> | ||
Line 36: | Line 33: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']] |
− | ;(B) [[ | + | ;(B) [[SBS Roof Systems Standard#PART_6|'''Air and Vapour Control Layer Seal''']] |
− | ;(C) [[ | + | ;(C) [[SBS Roof Systems Standard#PART_5|'''Acceptable Wall Surface''']] |
;(D) '''Wood Blocking''' | ;(D) '''Wood Blocking''' | ||
;(E) '''Flexible Insulation''' | ;(E) '''Flexible Insulation''' | ||
− | ;(F) [[ | + | ;(F) [[SBS Roof Systems Standard#PART_10|'''Sloped Wood Blocking''']]: Required over 100 mm (4") parapet width. |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | + | '''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements. | |
− | '''NOTE''': | ||
− | |||
<hr> | <hr> | ||
+ | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']] | ||
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | |||
− | |||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 17:46, 27 October 2023
Division D - Construction Details
SBS | Parapet (Independent of Roof Structure) ( Article 10.3.4.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- Mechanically fasten to outside face of parapet blocking (F). Do not mop outside edge. At least one ply must extend over outside edge.
- (7) Metal Base Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See Section 13.6 - Cap Flashings, Base Flashings and Reglets.
- (8) Metal Cap Flashing
- Flashings 7 and 8 may be one piece. See Section 14. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. See Section 13.3 - Attachment.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Air and Vapour Control Layer Seal
- (C) Acceptable Wall Surface
- (D) Wood Blocking
- (E) Flexible Insulation
- (F) Sloped Wood Blocking
- Required over 100 mm (4") parapet width.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.