Difference between revisions of "SBS Fall Protection Anchor in Wall"

Jump to: navigation, search

Difference between revisions of "SBS Fall Protection Anchor in Wall"

 
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{Template:RPM Info}}
 
{{Template:RPM Info}}
 +
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
<big><big><big><big><big>SBS | Fall Protection Anchor in Wall ([[SBS_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big>
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
{{Template:Construction Details Header}}
|}
 
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
Line 9: Line 13:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:10.3.7.2.jpg|class=img-responsive]]
+
[[File:10.3.7.2.jpg| link=http://rpm.rcabc.org/images/9/9a/10.3.7.2.jpg | class=img-responsive]]
 
</div>
 
</div>
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
Line 15: Line 19:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[SBS Roof Systems Standard#SBSCONVENTIONAL|'''Conventional Roof Assembly''']]
+
;(1) [[SBS Roof Systems Standard#PART_1|'''Conventional Roof Assembly''']]
;(2) [[SBS Roof Systems Standard#METALCAP-SBS|'''Metal Counter-flashing''']]
+
;(2) [[SBS Roof Systems Standard#PART_13|'''Metal Counter-flashing''']]
;(3) [[SBS Roof Systems Standard#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in Division C of this ''Manual''.
;(4) [[SBS Roof Systems Standard#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Membrane Flashing''']].
+
;(4) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']].
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Deck''']]:
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Deck''']]:
;(B) '''Wall Anchor''': Anchor selection and attachment details are the responsibility of the Design Authority
+
;(B) '''Wall Anchor''': Anchor selection and attachment details are the responsibility of the ''Design Authority''.
 
;(C) '''Anchor Eye'''
 
;(C) '''Anchor Eye'''
 
;(D) '''Anchor Placement''': Minimum 200 mm (8") above finished roof surface.
 
;(D) '''Anchor Placement''': Minimum 200 mm (8") above finished roof surface.
Line 36: Line 40:
 
<hr>
 
<hr>
  
[[SBS Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']]
+
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 18:33, 27 June 2022



Division D - Construction Details


SBS | Fall Protection Anchor in Wall ( Article 12.3.2.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

10.3.7.2.jpg

1 WORK INCLUDED

(1) Conventional Roof Assembly
(2) Metal Counter-flashing
(3) Insulation
See available insulation products in Division C of this Manual.
(4) Primary Membrane and Membrane Flashing.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wall Anchor
Anchor selection and attachment details are the responsibility of the Design Authority.
(C) Anchor Eye
(D) Anchor Placement
Minimum 200 mm (8") above finished roof surface.
(E) Plywood
15.9 mm (5/8") treated where required.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.