Difference between revisions of "TPO Roof System Details"

Jump to: navigation, search

Difference between revisions of "TPO Roof System Details"

(Part 10 - Perimeters and Walls)
 
(60 intermediate revisions by the same user not shown)
Line 1: Line 1:
:[[TPO Details:D3.7.1 (Mechanically Attached Generic Conventional Assembly)|D3.7.1 Mechanically Attached Generic Conventional Assembly]]
+
{{Template:RPM Info}}
:[[TPO Details:D3.7.2 (Fully Adhered)|D3.7.2 Fully Adhered]]
 
:[[TPO Details:D3.7.3 (Ballasted Protected Membrane)|D3.7.3 Ballasted Protected Membrane]]
 
:[[TPO Details:D3.7.4 (Curb Opening)|D3.7.4 Curb Opening]]
 
:[[TPO Details:D3.7.5 (Clamping Copper Drain)|D3.7.5 Clamping Copper Drain]]
 
:[[TPO Details:D3.7.6 (Two-Part Box Flashing)|D3.7.6 Two-Part Box Flashing]]
 
:[[TPO Details:D3.7.7 (Mechanical Curb Opening)|D3.7.7 Mechanical Curb Opening]]
 
:[[TPO Details:D3.7.8 (Roof Edge)|D3.7.8 Roof Edge]]
 
  
 +
__NONUMBEREDHEADINGS__
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
  
 +
:<big><big>Division D - Construction Details</big></big>
 +
:<hr>
 +
:<big><big><big><big><big>Construction Details for TPO Membrane Roof Systems</big></big></big></big></big>
  
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''TPO/PVC Application'']]
+
<div class="col-md-2">
 +
:[[File:TPO project (courtesy Carlisle Syntec).jpg| link=http://rpm.rcabc.org/images/5/58/TPO_project_%28courtesy_Carlisle_Syntec%29.jpg | 175 px]]
 +
</div>
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
<div class="col-md-10">
 +
:The drawings linked on this page are intended to represent a variety of TPO Membrane roof system applications while remaining generic with regards to manufacturers&#8217; specific application specifications. They do not represent all possible ''manufacturer'' application roof system designs. Consult each ''manufacturer's'' specifications and the '''''RoofStar Guarantee Standards''''' to develop a system acceptable to both the manufacturer and the '''''RoofStar Guarantee Program'''''.
 +
 
 +
:For further information about TPO Membrane System designs and requirements, see the '''[https://rpm.rcabc.org/index.php?title=TPO_Roof_Systems_Standard Standard for TPO Membrane Roof Systems]'''.
 +
</div>
 +
 
 +
<div class="col-md-12">
 +
</div>
 +
<div class="col-md-4">
 +
<hr>
 +
===Part 1 - General===
 +
====='''Permitted Roof Systems''' ([[TPO_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])=====
 +
<ol>
 +
<li>[[TPO Conventionally Insulated System (Typical)| Conventionally Insulated System (Typical)]]
 +
<li>[[TPO Conventionally Insulated System (Alternate) | Conventionally Insulated System (Alternate)]]
 +
<li>[[TPO Protected Roof Assembly (Typical)  | Protected Roof Assembly (Typical)]]
 +
</li></ol>
 +
 
 +
===Part 6 - Air and Vapour Controls===
 +
====='''Continuity and Support''' ([[TPO_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])=====
 +
<ol>
 +
<li>[[TPO Air and Vapour Controls (Field) | {{hilite | Air and Vapour Controls (Field)|| 2021-February-7 }}]]
 +
</li></ol>
 +
 
 +
 
 +
</div>
 +
<div class="col-md-4">
 +
<hr>
 +
 
 +
===Part 10 - Perimeters and Walls===
 +
====='''General Application''' ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])=====
 +
<ol>
 +
<li>[[TPO Membrane Termination A | Membrane Termination A]]
 +
<li>[[TPO Membrane Termination B | Membrane Termination B]]
 +
<li>[[TPO Membrane Termination C | Membrane Termination C]]
 +
<li>[[TPO Membrane Termination D | Membrane Termination D]]
 +
<li>[[TPO Membrane Termination E | Membrane Termination E]]
 +
<li>[[TPO Membrane Termination F | Membrane Termination F]]
 +
</li></ol>
 +
 
 +
====='''Low-profile Edges''' ([[TPO_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])=====
 +
<ol>
 +
<li>[[TPO Metal Edge Termination | Metal Edge Termination]]
 +
</li></ol>
 +
 
 +
===Part 11 - Drainage===
 +
 
 +
</div>
 +
<div class="col-md-4">
 +
<hr>
 +
 
 +
===Part 12 - Penetrations and Curbs===
 +
 
 +
===Part 13 - Linear Metal Flashing===
 +
:See the separate page, [[Linear_Metal_Flashing_Details | Construction Details for Linear Metal Flashings]].
 +
 
 +
===Part 14 - The Roof as a Platform===
 +
 
 +
</div>
 +
 
 +
<div class="col-md-12">
 +
<hr>
 +
 
 +
[[TPO Roof Systems Standard|<i class="fa fa-chevron-circle-left" ></i> ''Standard for TPO Membrane Roof Systems'']]
 +
 
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 +
{{Template:RPM Page Footer with Copyright and Current Date}}
 +
</div>

Latest revision as of 16:39, 26 February 2024



Division D - Construction Details

Construction Details for TPO Membrane Roof Systems
TPO project (courtesy Carlisle Syntec).jpg
The drawings linked on this page are intended to represent a variety of TPO Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
For further information about TPO Membrane System designs and requirements, see the Standard for TPO Membrane Roof Systems.

Part 12 - Penetrations and Curbs

Part 13 - Linear Metal Flashing

See the separate page, Construction Details for Linear Metal Flashings.

Part 14 - The Roof as a Platform


Standard for TPO Membrane Roof Systems

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.