Difference between revisions of "Template:User Consent and Agreement"

Jump to: navigation, search

Difference between revisions of "Template:User Consent and Agreement"

(Created page with "{{Template:RPM Info}} <html> <div class="modal fade" id="modalLoginForm" tabindex="-1" role="dialog" aria-labelledby="myModalLabel" aria-hidden="true"> <div class="modal-...")
 
 
(3 intermediate revisions by the same user not shown)
Line 13: Line 13:
 
       </div>
 
       </div>
 
           <div class="modal-body mx-3">
 
           <div class="modal-body mx-3">
The <b>RGC Roofing Practices Manual</b> ("RPM", "Manual") and its Standards are freely accessible to anyone (the “user”) but are intended solely for the purpose of qualifying a <i>project</i> for a <b><i>RoofStar Guarantee</b></i>; they must not be considered a comprehensive resource for roofing and waterproofing at grade.  Note that all Standards must be read in conjunction with the installation requirements published variously by <i>manufacturers</i> or testing authorities. Ultimate responsibility for a design that relies on this <i>Manual</i> and its Standards rests with the user.
+
The <b>RGC Roofing Practices Manual</b> ("RPM", "Manual") and its Standards are freely accessible to anyone (the “User”).  By using any or all resources in this <i>Manual</i>, the User agrees with and consents to the following conditions:
<br><br>
+
<ol>
By using this <i>Manual</i> the "user" consents to these terms and agrees to hold the owner of this <i>Manual</i> (the Roofing Contractors Association and its entities) harmless from any and all claims arising out of the use or misuse of any part of this <i>Manual</i>.
+
<li>All materials in this <i>Manual</i> are intended solely to support a project designed to qualify for a <b><i>RoofStar Guarantee</b></i>, which is issued by the RCABC Guarantee Corp. (<b>RGC</b>);
 +
<li>Neither the <i>Manual</i> generally, nor the Standards specifically, are a comprehensive resource for roofing and waterproofing at grade, and therefore the User must be familiar with all aspects of a project's design and construction;
 +
<li>All RGC Standards must be read together with the Building Code having jurisdiction, with local or regional requirements, and in conjunction with the installation requirements published variously by <i>manufacturers</i>;
 +
<li>All the content in a given Standard is applicable to the design and construction of a project; the User must therefore be familiar with the entirety of a Standard and not just with select Parts.
 +
<li>Full responsibility for a design that relies on this <i>Manual</i> and its Standards rests with the User.
 +
</li></ol>
 
         </div>
 
         </div>
  
Line 24: Line 29:
  
 
<div class="text-center">
 
<div class="text-center">
   <a href="" class="btn btn-warning btn-rounded btn-lg mb-4" data-toggle="modal" data-target="#modalLoginForm"><big><big>User Conditions and Agreement</big></big></a>
+
   <a href="" class="btn btn-info btn-rounded btn-lg mb-4" data-toggle="modal" data-target="#modalLoginForm"><big><big>User Conditions and Agreement</big></big></a>
 
</div>
 
</div>
 
</html>
 
</html>

Latest revision as of 23:12, 8 February 2023