Difference between revisions of "Working Page 3"

Jump to: navigation, search

Difference between revisions of "Working Page 3"

(Created page with " __NOTOC__ __NONUMBEREDHEADINGS__ {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} <big...")
 
 
(362 intermediate revisions by the same user not shown)
Line 1: Line 1:
  
__NOTOC__
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 
__NONUMBEREDHEADINGS__
 
__NONUMBEREDHEADINGS__
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
+
<div class="row">
 +
 
 +
  <div class="col-md-3" style="float:right;" id="tocDiv">
 +
      <div class="noautonum">__TOC__</div>
 +
  </div> <!-- tocDiv -->
  
<big><big>Division C - Accepted Materials</big></big>
+
  <div class="col-md-9" id="mainBodyDiv">
<hr>
 
<big><big><big><big><big>CertainTeed LLC</big></big></big></big></big><br>
 
<big>Associate Member (Manufacturer)</big>
 
{| class="wikitable"
 
|-
 
| style="background-color:#FFFACD" | '''<big>Materials Listed by Category</big>'''
 
<br>
 
The information published in the RCABC '''''Roofing Practices Manual''''' and offered below does NOT represent a complete set of the manufacturer’s data or specifications, nor is this material recommended or endorsed by the ''Guarantor''. The preparation of a detailed specification is the responsibility of the ''Design Authority''.
 
|-
 
|
 
;:
 
;Website: '''http://www.certainteed.com'''
 
;Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']
 
;Country of Origin: U.S.A.
 
;Country of Manufacture: U.S.A.
 
;Year First Installed:
 
:BC:
 
:Canada:
 
:Foreign:
 
|}
 
  
<div class="col-md-4">
+
<big><big>Division A - Scope, Use of Standards, and Guarantee </big></big>
<big><big>'''Water-shedding Roofs'''</big></big>
 
 
<hr>
 
<hr>
 +
<big><big><big><big><big>Part 4 - Specifying a RoofStar Guarantee</big></big></big></big></big>
 +
===Section 4.1. Quality Assurance===
 +
(The following sample wordings may be used by the specifier, for a ''project'' intended to qualify for a '''''RoofStar Guarantee''''')
 +
====4.1.1. Specifications====
 +
=====<big>4.1.1.1. Sample Wording</big>=====
 +
<ol>
 +
<li>Specifying authorities requesting the '''''RoofStar Guarantee''''' may insert the following wording into their specifications:
 +
<ol>
 +
<li>Workmanship {{hilite | and material requirements shall || 2025-October-25 }} {{strike| standards || 2024-October-22 }} conform to the latest RoofStar Guarantee Standards as published in the {{hilite | {{strike| RoofStar || 2024-October-22 }} RCABC Roofing Practices Manual{{strike| for a RoofStar Guarantee || 2024-October-22 }} || 2025-October-25 }}, unless modified by the contract documents to exceed these minimums.
 +
<li>Independent Observations (preferred wording)
 +
<ol>
 +
<li>{{hilite | shall be performed {{strike| using || 2024-October-22 }} by an independent Observation company {{strike| acceptable to the RoofStar Guarantee Program || 2024-October-22 }}accepted by the RCABC Guarantee Corp., the Owner, and the consultant|| 2025-October-25 }}.
 +
<li>{{hilite | shall be performed published in Article 1.1.2.4. of the Standards, and as required by the '''''RoofStar Guarantee Program'''''|| 2025-October-25 }}.
 +
<li>{{hilite | costs are to be paid directly by the ''owner''|| 2025-October-25 }}.
 +
</li></ol>
 +
<li>Independent Observation (optional wording)
 +
<ol>
 +
<li>shall be performed {{strike| using || 2024-October-22 }} by an Independent Observation company {{strike| acceptable to the RoofStar Guarantee Program || 2024-October-22 }}accepted by the RCABC Guarantee Corp., the Owner, and the consultant, to be assigned by the '''''Guarantor'''''.
 +
<li>{{hilite | shall be performed published in Article 1.1.2.4. of the Standards, and as required by the '''''RoofStar Guarantee Program'''''|| 2025-October-25 }}.
 +
<li>{{hilite | costs shall be included in this contract|| 2025-October-25 }}.
 +
</li></ol>
 +
</li></ol>
 +
<li>{{hilite | Specifying authorities requesting the '''''RoofStar Vegetated Roof Guarantee''''' may insert the following wording into their specification, which should form part of Division 07 (roofing and waterproofing division)|| 2025-October-25 }}:
 +
<ol>
 +
<li>{{hilite | Workmanship and system requirements shall conform to the latest version of the “RGC Standard for Vegetated Roofs” and the latest standard for the supporting ''roof assembly''|| 2025-October-25 }}.
 +
<li>{{hilite | The construction and commissioning of the ''vegetated roof assembly'' shall be managed by a person or team qualified by the RCABC Guarantee Corp. for project management of ''vegetated roof assemblies''|| 2025-October-25 }}.
 +
<li>{{hilite | Installation of the ''vegetated roof system'' shall be undertaken by installers qualified by the RCABC Guarantee Corp. and listed in the Roofing Practices Manual|| 2025-October-25 }}.
 +
<li>{{hilite | The ''growing media'' shall be supplied by, or acceptable to, the RCABC Member ''vegetated roof system manufacturer''|| 2025-October-25 }}.
 +
<li>{{hilite | Development care and maintenance shall be included as part of the installer’s scope of work|| 2025-October-25 }}.
 +
<li>{{hilite | Independent Observations (preferred wording)|| 2025-October-25 }}
 +
<ol>
 +
<li>{{hilite | shall be performed by an independent Observation company accepted by the RCABC Guarantee Corp., the Owner, and the consultant, with observers trained in the observation of ''vegetated roof assemblies''|| 2025-October-25 }}.
 +
<li>{{hilite | performed as published in Article 1.1.2.4. of the “RGC Standard for Vegetated Roofs”, and as required by the '''''RoofStar Guarantee Program'''''|| 2025-October-25 }}.
 +
<li>{{hilite | Observation costs shall be paid directly by the Owner|| 2025-October-25 }}.
 +
</li></ol>
 +
<li>{{hilite | Independent Observations (optional wording)|| 2025-October-25 }}
 +
<ol>
 +
<li>{{hilite | shall be performed by an independent Observation company accepted by the RCABC Guarantee Corp., the Owner, and the consultant, to be assigned by the '''''Guarantor'''''|| 2025-October-25}}.
 +
<li>{{hilite | shall be performed published in Article 1.1.2.4. of the “RGC Standard for Vegetated Roofs”, and as required by the '''''RoofStar Guarantee Program'''''|| 2025-October-25 }}.
 +
</li></ol>
 +
</li></ol>
 +
</li></ol>
  
====Underlayment/Eave Protection (Asphalt Shingles/Cedar/Tiles)====
+
===Section 4.2. Guarantee===
:'''Mechanically Fastened Materials'''
+
====4.2.1. Specifications====
:[[Materials:DiamondDeck|DiamondDeck]]
+
=====<big>4.2.1.1. Sample Wording</big>=====
:[[Materials:Roofers Select|Roofers Select Underlayment]]
+
<ol>
:[[Materials:RoofRunner|RoofRunner Underlayment]]
+
<li>Provide the '''''RoofStar Guarantee''''' for five, ten or fifteen years, {{hilite | including the cost for the applicable Performance Reviews|| 2025-October-25 }}.
:[[Materials:RoofRunner AIR | {{hilite | RoofRunner AIR || 2024-June-15 }}]]
+
<li>{{hilite | Provide the '''''RoofStar Vegetated Roof Guarantee''''' for two years, including the cost for the applicable Performance Review|| 2025-October-25 }}.
 
+
</li></ol>
:'''Self-adhered Materials'''
 
:[[Materials:WinterGuard Sand|WinterGuard Sand]]
 
:[[Materials:WinterGuard HT|WinterGuard HT]]
 
:[[Materials:WinterGuard Granular |WinterGuard Granular]]
 
 
 
====Underlayment/Eave Protection (ASM)====
 
:'''Mechanically Fastened Materials'''
 
:[[Materials:RoofRunner AIR | {{hilite | RoofRunner AIR || 2024-June-15 }}]]
 
  
:'''Self-adhered Materials'''
 
:[[Materials:DiamondDeck|DiamondDeck]]
 
  
</div>
 
<div class="col-md-4">
 
<big><big>'''Water-shedding Roofs'''</big></big>
 
 
<hr>
 
<hr>
  
====Asphalt Shingles====
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
:[[Materials:Carriage House|Carriage House]]
 
:[[Materials:Grand Manor |Grand Manor]]
 
:[[Materials:Highland Slate|Highland Slate]]
 
:[[Materials:Independence AR|Independence AR]] <small><small>(awaiting TDS)</small></small>
 
:[[Materials:Landmark |Landmark]]
 
:[[Materials:Landmark AR|Landmark AR]]
 
:[[Materials:Landmark IR |Landmark IR]] <small><small>(awaiting TDS)</small></small>
 
:[[Materials:Landmark PREMIUM|Landmark PREMIUM]]
 
:[[Materials:Landmark PREMIUM AR|Landmark PREMIUM AR]]
 
:[[Materials:Landmark Pro / Architect 80|Landmark Pro / Architect 80]]
 
:[[Materials:Landmark Pro / Architect 80 AR|Landmark Pro / Architect 80 AR]]
 
  
</div>
+
</div><!-- mainBodyDiv -->
<div class="col-md-4">
+
</div><!-- row -->
<big><big>'''Water-shedding Roofs'''</big></big>
 
<hr>
 
  
====Asphalt Shingles (Cont.)====
+
{{Template:RPM Page Footer with Copyright and Current Date}}
 
 
:[[Materials:Landmark Solaris Gold |Landmark Solaris Gold]] <small><small>(awaiting TDS)</small></small>
 
:[[Materials:Landmark Solaris Platinum|Landmark Solaris Platinum]] <small><small>(awaiting TDS)</small></small>
 
:[[Materials:Landmark TL |Landmark TL]]
 
:[[Materials:Landmark TL AR |Landmark TL AR]]
 
:[[Materials:Northgate SBS|Northgate SBS]]
 
:[[Materials:Presidential Shake|Presidential Shake]]
 
:[[Materials:Presidential Shake AR|Presidential Shake AR]]
 
:[[Materials:Presidential Shake TL |Presidential Shake TL]]
 
:[[Materials:Presidential Shake TL AR|Presidential Shake TL AR]]
 
 
 
</div>
 
 
 
</div>
 
<div class="col-md-12">
 
 
 
<hr>
 
 
 
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
</div>
 

Latest revision as of 14:32, 1 November 2024


Division A - Scope, Use of Standards, and Guarantee


Part 4 - Specifying a RoofStar Guarantee

Section 4.1. Quality Assurance

(The following sample wordings may be used by the specifier, for a project intended to qualify for a RoofStar Guarantee)

4.1.1. Specifications

4.1.1.1. Sample Wording
  1. Specifying authorities requesting the RoofStar Guarantee may insert the following wording into their specifications:
    1. Workmanship and material requirements shall conform to the latest RoofStar Guarantee Standards as published in the RCABC Roofing Practices Manual , unless modified by the contract documents to exceed these minimums.
    2. Independent Observations (preferred wording)
      1. shall be performed by an independent Observation company accepted by the RCABC Guarantee Corp., the Owner, and the consultant.
      2. shall be performed published in Article 1.1.2.4. of the Standards, and as required by the RoofStar Guarantee Program.
      3. costs are to be paid directly by the owner.
    3. Independent Observation (optional wording)
      1. shall be performed by an Independent Observation company accepted by the RCABC Guarantee Corp., the Owner, and the consultant, to be assigned by the Guarantor.
      2. shall be performed published in Article 1.1.2.4. of the Standards, and as required by the RoofStar Guarantee Program.
      3. costs shall be included in this contract.
  2. Specifying authorities requesting the RoofStar Vegetated Roof Guarantee may insert the following wording into their specification, which should form part of Division 07 (roofing and waterproofing division):
    1. Workmanship and system requirements shall conform to the latest version of the “RGC Standard for Vegetated Roofs” and the latest standard for the supporting roof assembly.
    2. The construction and commissioning of the vegetated roof assembly shall be managed by a person or team qualified by the RCABC Guarantee Corp. for project management of vegetated roof assemblies.
    3. Installation of the vegetated roof system shall be undertaken by installers qualified by the RCABC Guarantee Corp. and listed in the Roofing Practices Manual.
    4. The growing media shall be supplied by, or acceptable to, the RCABC Member vegetated roof system manufacturer.
    5. Development care and maintenance shall be included as part of the installer’s scope of work.
    6. Independent Observations (preferred wording)
      1. shall be performed by an independent Observation company accepted by the RCABC Guarantee Corp., the Owner, and the consultant, with observers trained in the observation of vegetated roof assemblies.
      2. performed as published in Article 1.1.2.4. of the “RGC Standard for Vegetated Roofs”, and as required by the RoofStar Guarantee Program.
      3. Observation costs shall be paid directly by the Owner.
    7. Independent Observations (optional wording)
      1. shall be performed by an independent Observation company accepted by the RCABC Guarantee Corp., the Owner, and the consultant, to be assigned by the Guarantor.
      2. shall be performed published in Article 1.1.2.4. of the “RGC Standard for Vegetated Roofs”, and as required by the RoofStar Guarantee Program.

Section 4.2. Guarantee

4.2.1. Specifications

4.2.1.1. Sample Wording
  1. Provide the RoofStar Guarantee for five, ten or fifteen years, including the cost for the applicable Performance Reviews.
  2. Provide the RoofStar Vegetated Roof Guarantee for two years, including the cost for the applicable Performance Review.



Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.