Difference between revisions of "SBS Sealant Pocket"

Jump to: navigation, search

Difference between revisions of "SBS Sealant Pocket"

(RELATED WORK BY OTHERS)
m (James Klassen moved page SBS 11.3.3.4 Sealant Pocket to SBS Sealant Pocket)
 
(28 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[File:10.3.5.4.jpg]]
+
{{Template:RPM Info}}
  
=== WORK INCLUDED ===
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
(1) <b>Gypsum Overlay Board: </b>If required by design authority.
+
__NOTOC__
  
(2) <b>Vapour Retarder:</b> If required by design authority.
+
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>SBS | Sealant Pocket ([[SBS_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:10.3.5.4.jpg| link=http://rpm.rcabc.org/images/1/1c/10.3.5.4.jpg | class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
(3) <b>Insulation:</b> See list of accepted materials in Section 2.2.
+
<div class="col-md-6">
 +
=== WORK INCLUDED ===
 +
;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority.
 +
;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority
 +
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically fastened.  See available insulation products in Division C of this ''Manual''.
 +
;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: As required.
 +
;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#SBSPROTECTION| '''Membrane Protection''']]
 +
;(6) '''Compatible Mastic''': Use only the membrane manufacturer's approved sealant.
 +
;(7) [[SBS Roof Systems Standard#PART_11|'''Sealant Pocket''']]: Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4").
 +
;(8) [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Onto primed metal flashing flange.
 +
;(9) '''Packing''': To prevent displacement of compatible mastic.
 +
;(10) '''Structural Sealant''': Use only the membrane manufacturers&#8217; approved proprietary polyurethane based structural sealant.
 +
;(11) '''Back-up Storm Collar''': To be installed whenever practical. Caulk at top of collar.
  
(4) <b>Insulation Overlay:</b> As required. See <i>RGC Guarantee Standard B4.1, B4.2 and C4.1</i>
+
<hr>
 
 
(5) <b>Primary Membrane and Membrane Protection</b>
 
 
 
(6) <b>Compatible Mastic:</b> Use only the membrane manufacturers&#8217; approved sealant.
 
 
 
(7) <b>Metal Gum Pan or Pitch Pocket:</b> Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4"). See <i>RGC Guarantee Standard A6.2</i>
 
 
 
(8) <b>Membrane Flashing:</b> Onto primed metal flashing flange.
 
 
 
(9) <b>Packing:</b> To prevent displacement of compatible mastic.
 
 
 
(10) <b>Structural Sealant:</b> Use only the membrane manufacturers&#8217; approved proprietary polyurethane based structural sealant.
 
 
 
(11) <b>Back-up Storm Collar:</b> To be installed whenever practical. Caulk at top of collar.
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
(A) <b>Acceptable Deck</b>
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']]
 +
;(B) '''Protrusion'''
 +
;(C) '''Wood Blocking'''
  
(B)<b> Protrusion</b>
 
  
(C)<b> Wood Blocking</b>
+
*<b>WARNING: <u>DO NOT USE</u> THIS DETAIL WITH HOT PIPES.</b>
 +
*<b>AVOID THIS DETAIL:</b> Wherever possible use Flanged Metal Stack Flashing or Curbed Opening.
 +
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
;NOTE: Refer to <i>RGC Guarantee Standards</i> for additional requirements.
 
*<b>WARNING: <u>DO NOT USE</u> THIS DETAIL WITH HOT PIPES.</b>
 
*<b>AVOID THIS DETAIL:</b> Wherever possible use Flanged Metal Stack Flashing or Curbed Opening (See Section 10.3).
 
  
 +
'''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Application'']]
 
 
 
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 

Latest revision as of 18:47, 27 June 2022



Division D - Construction Details


SBS | Sealant Pocket ( Article 12.3.2.8.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

10.3.5.4.jpg

1 WORK INCLUDED

(1) Supporting Deck Overlay
If required by design authority.
(2) Air or Vapour Control Layers
If required by design authority
(3) Insulation
Mechanically fastened. See available insulation products in Division C of this Manual.
(4) Insulation Overlay
As required.
(5) Primary Membrane and Membrane Protection
(6) Compatible Mastic
Use only the membrane manufacturer's approved sealant.
(7) Sealant Pocket
Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4").
(8) Membrane Flashing
Onto primed metal flashing flange.
(9) Packing
To prevent displacement of compatible mastic.
(10) Structural Sealant
Use only the membrane manufacturers’ approved proprietary polyurethane based structural sealant.
(11) Back-up Storm Collar
To be installed whenever practical. Caulk at top of collar.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Protrusion
(C) Wood Blocking


  • WARNING: DO NOT USE THIS DETAIL WITH HOT PIPES.
  • AVOID THIS DETAIL: Wherever possible use Flanged Metal Stack Flashing or Curbed Opening.


NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.