Difference between revisions of "SBS Expansion Joint (Field)"

Jump to: navigation, search

Difference between revisions of "SBS Expansion Joint (Field)"

(RELATED WORK BY OTHERS)
(WORK INCLUDED)
 
(32 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[File:10.3.4.1.jpg]]
+
{{Template:RPM Info}}
  
=== WORK INCLUDED ===
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority
+
__NOTOC__
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: As required.
 
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
 
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSTRIPTERM|'''Membrane Flashing''']]: Mechanically fasten to top of blocking (C).
 
;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSTRIPTERM|'''Flashing Underlay''']]: Minimum self-adhered modified bitumen or as per membrane manufacturer&#8217;s recommended detail.
 
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Base Flashing''']]: Mechanically fasten to top of wood blocking. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
 
;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Top surface must be sloping. Extend beyond and over-break at top corners. Fasten with concealed clip-type fasteners <b>or</b> cladding screws evenly spaced between seams.
 
  
 +
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
 +
<big><big><big><big><big>SBS | Expansion Joint (Field) ([[SBS_Roof_Systems_Standard#10.3.6.1._Expansion_Joints | Article 10.3.6.1.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:Part 10 - SBS Expansion Joint (field).png|link=https://rpm.rcabc.org/images/3/3a/Part_10_-_SBS_Expansion_Joint_%28field%29.png | class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
=== RELATED WORK BY OTHERS ===
+
<div class="col-md-6">
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']]
+
=== WORK INCLUDED ===
;(B) '''Air / Vapour Seal'''
+
;(1) [[SBS Roof Systems Standard#PART_10|'''Base sheet membrane flashing''']]: Waterproofs the expansion joint structure and provides a base layer for the control joint material to bond with.
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSEXPANSION|'''Expansion Joint Assembly''']]: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface. Minimum height may be reduced to 100mm (4") if the primary roof membrane flashing is fully supported and sealed over the top.  Primed where applicable. Top must be sloped.
+
;(2) [[SBS Roof Systems Standard#PART_10|'''Expansion joint (elastomeric product illustrated)''']]: This joint is proprietary to its manufacturer and will be fitted, manufactured, and installed (or its installation supervised) by others.  Secured to substrate as required by manufacturer.
;(D) <b>Flexible Insulation</b>
+
;(3) '''Reinforced membrane strip''': Applied to cover the control joint and seal it to the base membrane system.
 
+
;(4) [[SBS Roof Systems Standard#PART_10|'''Cap sheet membrane flashing''']]: Installed as required in Part 10 and applied as the second or third of a two or three-ply membrane system, providing required coverage above the finished roof system surface. Smooth membrane is shown on parapet coping (may be granule-surfaced, depending on material specified).
 
+
;(5) [[SBS Roof Systems Standard#PART_13|'''Metal cap (coping) flashing''']]: Fabricated and installed as required in Part 13.
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
;(6) [[SBS Roof Systems Standard#PART_13|'''Metal counter-flashing''']]: The counter-flashing below the cap flashing is secured independently of the metal cap flashing to permit movement of the expansion joint assembly across the planes of anticipated structural movement.  Dimensions are project-specific.
  
  
 
<hr>
 
<hr>
  
 +
=== RELATED WORK BY OTHERS ===
 +
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable deck''']]
 +
;(B) '''Expansion joint structure'''
 +
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
 +
'''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements.
  
 +
<hr>
  
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Application'']]
+
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Construction Details'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 16:29, 12 December 2022



Division D - Construction Details


SBS | Expansion Joint (Field) ( Article 10.3.6.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

Part 10 - SBS Expansion Joint (field).png

1 WORK INCLUDED

(1) Base sheet membrane flashing
Waterproofs the expansion joint structure and provides a base layer for the control joint material to bond with.
(2) Expansion joint (elastomeric product illustrated)
This joint is proprietary to its manufacturer and will be fitted, manufactured, and installed (or its installation supervised) by others. Secured to substrate as required by manufacturer.
(3) Reinforced membrane strip
Applied to cover the control joint and seal it to the base membrane system.
(4) Cap sheet membrane flashing
Installed as required in Part 10 and applied as the second or third of a two or three-ply membrane system, providing required coverage above the finished roof system surface. Smooth membrane is shown on parapet coping (may be granule-surfaced, depending on material specified).
(5) Metal cap (coping) flashing
Fabricated and installed as required in Part 13.
(6) Metal counter-flashing
The counter-flashing below the cap flashing is secured independently of the metal cap flashing to permit movement of the expansion joint assembly across the planes of anticipated structural movement. Dimensions are project-specific.



2 RELATED WORK BY OTHERS

(A) Acceptable deck
(B) Expansion joint structure

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.