Difference between revisions of "EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"
Difference between revisions of "EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"
(4 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;1) [[RoofStar Guarantee Standards for EPDM Roof | + | ;1) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness or when required as a thermal barrier by design authority. |
− | ;(2) [[RoofStar Guarantee Standards for EPDM Roof | + | ;(2) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMVAPOUR|'''Vapour Retarder''']]: If required by design authority. |
− | ;(3) [[RoofStar Guarantee Standards for EPDM Roof | + | ;(3) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. |
− | ;(4) [[RoofStar Guarantee Standards for EPDM Roof | + | ;(4) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''. |
;(5) '''Mastic''': Compatible mastic or sealant. | ;(5) '''Mastic''': Compatible mastic or sealant. | ||
− | ;(6) [[RoofStar Guarantee Standards for EPDM Roof | + | ;(6) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Thermoset membrane may be joined using uncured tape or proprietary adhesive; |
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[RoofStar Guarantee Standards for EPDM Roof | + | ;(A) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMDECKS|'''Acceptable Deck''']] |
;(B) '''Clamping Copper Drain''': Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant. | ;(B) '''Clamping Copper Drain''': Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant. | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
Line 31: | Line 31: | ||
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | ||
* Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C. | * Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C. | ||
− | |||
<hr> | <hr> | ||
− | + | [[RoofStar Guarantee Standards for EPDM Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for EPDM Roof Assemblies]] | |
− | |||
− | [[ | ||
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']] | [[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']] | ||
− | [[ | + | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Latest revision as of 18:30, 23 October 2017
RoofStar Guarantee Standards are blue-linked |
EPDM Details
1 WORK INCLUDED
- 1) Gypsum Deck Overlay
- May be required depending on insulation thickness or when required as a thermal barrier by design authority.
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (4) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (5) Mastic
- Compatible mastic or sealant.
- (6) Membrane Flashing
- Adhered according to manufacturer's printed specifications using proprietary adhesive. Thermoset membrane may be joined using uncured tape or proprietary adhesive;
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Clamping Copper Drain
- Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
- Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.
RoofStar Guarantee Standards for EPDM Roof Assemblies