Difference between revisions of "WP Details:F1.7.7 (Walls - Low Door Sill)"
Difference between revisions of "WP Details:F1.7.7 (Walls - Low Door Sill)"
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | {{Template:RPM Info}} | ||
+ | |||
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>WP Details:F1.7.7 (Walls - Low Door Sill)</big></big></big></big></big> | ||
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
− | | colspan="2" | <big>''''' | + | | colspan="2" | <big>'''''Notice to Reader'''''</big> |
+ | |- | ||
+ | | style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[Grade-level Waterproofing Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span> | ||
|} | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
Line 7: | Line 17: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:9.6.7.jpg|class=img-responsive]] | + | [[File:9.6.7.jpg| link=http://rpm.rcabc.org/images/7/7e/9.6.7.jpg | class=img-responsive]] |
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 13: | Line 23: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | + | ;(1) [[Grade-level Waterproofing Standard#WPMEMBRANE | '''Primary Waterproofing Membrane''']]: Fully adhered to acceptable substrates. | |
− | (1) | + | ;(2) [[Grade-level Waterproofing Standard#WPSTRIPPING | '''Membrane Flashing''']]: At walls membrane flashing must be carried up walls a minimum of 100mm (4") in height above the finished waterproofing assembly be it ballast, pavers or other permeable wearing course. At door sill openings membrane flashing may be less than 100mm (4") in height above the finished waterproofing assembly but must not be less than 100mm (4") in height above the primary waterproofing membrane. Low door sills shall incorporate a metal water stop flashing that is mechanically attached to the backside of door sill framing or openings and is sealed with elastomeric or SBS membrane flashing. In addition, membrane flashing gussets must be installed at door sill opening corners. For additional requirements refer to Section 7, [[Grade-level Waterproofing Standard#WPSTRIPPING|'''Perimeter Flashing: Membranes''']]. |
− | + | ;(3) [[Grade-level Waterproofing Standard#WPMETAL | '''Metal Base Flashing''']]: Required on all waterproofing assemblies. Flashing lengths joined by use of S-locks or standing seam joints. | |
− | (2) | + | ;(4) [[Grade-level Waterproofing Standard#WPMETAL | '''Metal Counter Flashing''']]: Extend behind wall finish (siding) minimum 50mm (2"). Flashing lengths joined by use of S-locks or standing seam joints. |
− | + | ;(5) Metal Water Stop Flashing: Mechanically attached to inside of door sill framing or opening. Cut flashing to fit opening and install membrane gussets at corners. | |
− | (3) | + | ;(6) Metal Pan Sill Flashing: Optional: Metal pan with water stop formed with pan folded, welded or soldered corners mechanically attached to inside of door sill frame or opening and sealed with membrane flashing. |
− | + | ;(7) [[Grade-level Waterproofing Standard#WPPROTECTION | '''Protection Board/Mat''']: Proprietary membrane protection board or mat approved by membrane manufacture, compatible with waterproofing membrane system, and compliant with Section 8, [[Grade-level Waterproofing Standard#WPPROTECTION|'''Membrane Protection''']]. | |
− | (4) | ||
− | |||
− | (5) | ||
− | |||
− | (6) | ||
− | (7) | ||
=== WORK BY OTHERS === | === WORK BY OTHERS === | ||
− | (A) | + | ;(A) [[Grade-level Waterproofing Standard#WPDECK | '''Acceptable Deck''']]: Concrete slab depicted. |
− | + | ;(B) Wall Cladding and Flashing | |
− | (B) | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[Grade-level Waterproofing Standard | '''Standard''']] for additional requirements. |
<hr> | <hr> | ||
+ | [[Grade-level Waterproofing System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Grade-level Waterproofing Construction Details'']] | ||
+ | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} | |
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 21:17, 7 September 2021
Division D - Construction Details
WP Details:F1.7.7 (Walls - Low Door Sill)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks |
Waterproofing Details for Plazas, Promenades and Terraces
1 WORK INCLUDED
- (1) Primary Waterproofing Membrane
- Fully adhered to acceptable substrates.
- (2) Membrane Flashing
- At walls membrane flashing must be carried up walls a minimum of 100mm (4") in height above the finished waterproofing assembly be it ballast, pavers or other permeable wearing course. At door sill openings membrane flashing may be less than 100mm (4") in height above the finished waterproofing assembly but must not be less than 100mm (4") in height above the primary waterproofing membrane. Low door sills shall incorporate a metal water stop flashing that is mechanically attached to the backside of door sill framing or openings and is sealed with elastomeric or SBS membrane flashing. In addition, membrane flashing gussets must be installed at door sill opening corners. For additional requirements refer to Section 7, Perimeter Flashing: Membranes.
- (3) Metal Base Flashing
- Required on all waterproofing assemblies. Flashing lengths joined by use of S-locks or standing seam joints.
- (4) Metal Counter Flashing
- Extend behind wall finish (siding) minimum 50mm (2"). Flashing lengths joined by use of S-locks or standing seam joints.
- (5) Metal Water Stop Flashing
- Mechanically attached to inside of door sill framing or opening. Cut flashing to fit opening and install membrane gussets at corners.
- (6) Metal Pan Sill Flashing
- Optional: Metal pan with water stop formed with pan folded, welded or soldered corners mechanically attached to inside of door sill frame or opening and sealed with membrane flashing.
- (7) [[Grade-level Waterproofing Standard#WPPROTECTION | Protection Board/Mat]
- Proprietary membrane protection board or mat approved by membrane manufacture, compatible with waterproofing membrane system, and compliant with Section 8, Membrane Protection.
2 WORK BY OTHERS
- (A) Acceptable Deck
- Concrete slab depicted.
- (B) Wall Cladding and Flashing
NOTE: See the Standard for additional requirements.
Back to Grade-level Waterproofing Construction Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.