Difference between revisions of "ASM 10.4.3 Ridge (Vented)"

Jump to: navigation, search

Difference between revisions of "ASM 10.4.3 Ridge (Vented)"

Line 13: Line 13:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.  
+
;(1) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.  
;(2) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMSLIP|'''Slip Sheet''']]: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.  
+
;(2) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSLIP|'''Slip Sheet''']]: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.  
;(7) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMPANEL |'''Architectural Metal Roof Panel''']] : Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.  
+
;(7) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMPANEL |'''Architectural Metal Roof Panel''']] : Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.  
;(4) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMCLIP|'''Metal Panel Clip''']]: Installed to metal roof panel manufacturer's printed instructions.  
+
;(4) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMCLIP|'''Metal Panel Clip''']]: Installed to metal roof panel manufacturer's printed instructions.  
;(5) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMZ |''''Z' Closure''']]: Set in accepted caulking and secured with compatible non-corrosive flat head fasteners.  
+
;(5) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMZ |''''Z' Closure''']]: Set in accepted caulking and secured with compatible non-corrosive flat head fasteners.  
 
;(6) '''Perforated Metal Screen'''  
 
;(6) '''Perforated Metal Screen'''  
 
;(7) '''Continuous Cleat'''
 
;(7) '''Continuous Cleat'''
Line 23: Line 23:
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMDECK|'''Acceptable Deck''']]
+
;(A) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMDECK|'''Acceptable Deck''']]
 
;(B) '''Wood Nailer'''
 
;(B) '''Wood Nailer'''
 
;(C) '''Air Space''': Determined by Design Authority.
 
;(C) '''Air Space''': Determined by Design Authority.

Revision as of 17:24, 23 October 2017

RoofStar Guarantee Standards are blue-linked
ASM Details

8.1.4.13.1.jpg

1 WORK INCLUDED

(1) Underlayment
The type of underlay required is determined by roof slope.
(2) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(7) Architectural Metal Roof Panel 
Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.
(4) Metal Panel Clip
Installed to metal roof panel manufacturer's printed instructions.
(5) 'Z' Closure
Set in accepted caulking and secured with compatible non-corrosive flat head fasteners.
(6) Perforated Metal Screen
(7) Continuous Cleat
(8) Metal Cap Flashing
Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wood Nailer
(C) Air Space
Determined by Design Authority.


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for ASM Roof Systems

Back to ASM Construction Details

Back to Construction Details