Difference between revisions of "TS Details:E4.7.6 (Tile - Wood Batten Construction)"
Difference between revisions of "TS Details:E4.7.6 (Tile - Wood Batten Construction)"
Line 14: | Line 14: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | (1)<b> Underlayment:</b> | + | (1)<b> Underlayment:</b> RoofStar-accepted eave protection / underlayment installed perpendicular to the slope with 50 mm (2") minimum side laps and 100 mm (4") minimum end laps. |
(2)<b> Wood Battens or Strapping: </b>Treated battens minimum 38 mm x 38 mm (1.5" x 1.5") or lath strapping minimum 12.7 mm x 38 mm (0.5" x 1.5") installed under horizontal battens using non-corrosive fasteners over underlay to provide unobstructed drainage. Install parallel to slope in line with roof structure supports beneath sheathing. | (2)<b> Wood Battens or Strapping: </b>Treated battens minimum 38 mm x 38 mm (1.5" x 1.5") or lath strapping minimum 12.7 mm x 38 mm (0.5" x 1.5") installed under horizontal battens using non-corrosive fasteners over underlay to provide unobstructed drainage. Install parallel to slope in line with roof structure supports beneath sheathing. | ||
Line 31: | Line 31: | ||
NOTE: | NOTE: | ||
− | *Refer to | + | *Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. |
<hr> | <hr> | ||
− | + | [[RoofStar Guarantee Standards for Tile & Slate Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Tile & Slate Roof Assemblies]] | |
− | [[RoofStar Guarantee Standards for Tile & Slate Roof | ||
[[Tile and Slate Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile and Slate Construction Details'']] | [[Tile and Slate Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile and Slate Construction Details'']] | ||
− | [[ | + | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 18:13, 23 October 2017
RoofStar Guarantee Standards are blue-linked |
1 WORK INCLUDED
(1) Underlayment: RoofStar-accepted eave protection / underlayment installed perpendicular to the slope with 50 mm (2") minimum side laps and 100 mm (4") minimum end laps.
(2) Wood Battens or Strapping: Treated battens minimum 38 mm x 38 mm (1.5" x 1.5") or lath strapping minimum 12.7 mm x 38 mm (0.5" x 1.5") installed under horizontal battens using non-corrosive fasteners over underlay to provide unobstructed drainage. Install parallel to slope in line with roof structure supports beneath sheathing.
(3) Wood Battens (Purlins): Treated battens 38 mm x 38 mm (1.5" x 1.5") applied over batten or strapping using non-corrosive fasteners. Install perpendicular to slope, spacing determined by manufacturers specification.
(4) Metal Facia: Shop built or manufacturers accepted proprietary eave flashing installed to cover open space between furring battens at facia.
2 RELATED WORK BY OTHERS
(A) Acceptable Deck
NOTE:
- Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for Tile & Slate Roof Assemblies