Difference between revisions of "SBS Conventionally Insulated System (typical)"

Jump to: navigation, search

Difference between revisions of "SBS Conventionally Insulated System (typical)"

(WORK INCLUDED)
(WORK INCLUDED)
Line 31: Line 31:
 
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Cap Sheet''']]: Applied according to manufacturer’s printed instructions, all options.
 
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Cap Sheet''']]: Applied according to manufacturer’s printed instructions, all options.
 
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Cap Sheet Flashing''']]: Applied according to manufacturer’s printed instructions to top of parapet or minimum 200 mm (8") above finished roof surface. All options.
 
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Cap Sheet Flashing''']]: Applied according to manufacturer’s printed instructions to top of parapet or minimum 200 mm (8") above finished roof surface. All options.
;(9) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSMETALFLASH|'''Metal Flashing''']]: As required by ''RoofStar Guarantee Standards''.
+
;(9) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Flashing''']]: As required by ''RoofStar Guarantee Standards''.
 
;(10) '''Primer''': Prime wood substrate to receive self-adhesive base membrane stripping.
 
;(10) '''Primer''': Prime wood substrate to receive self-adhesive base membrane stripping.
  

Revision as of 17:48, 29 January 2019

RoofStar Guarantee Standards are blue-linked
SBS Details

D1.7.1-1.jpg


Click below for a printable version of this page.
Print Sheet


1 WORK INCLUDED

(1) Gypsum Deck Overlay
Required when insulation is too thin to span flutes of steel decking or when required as a thermal barrier by design authority.
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
Mechanically fastened.
(4) Insulation Overlay Board
Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
(5) Base Sheet
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer’s specification. Torching directly to wood surfaces is not permitted.
(6) Base Sheet Flashing
Adhered according to manufacturer’s specifications using cold adhesive, hot asphalt self-adhered or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. Must be carried over to outside of parapet or minimum 200 mm (8") above finished roof surface.
(7) Cap Sheet
Applied according to manufacturer’s printed instructions, all options.
(8) Cap Sheet Flashing
Applied according to manufacturer’s printed instructions to top of parapet or minimum 200 mm (8") above finished roof surface. All options.
(9) Metal Flashing
As required by RoofStar Guarantee Standards.
(10) Primer
Prime wood substrate to receive self-adhesive base membrane stripping.

2 RELATED WORK BY OTHERS

(A) Acceptable Steel Deck
(B) Plywood Backing
Required on rough surfaces or where adhesive is asphalt. Must be primed.
(C) Sloped Wood Blocking
Sloped to roof where parapet is over 100 mm (4") in width. Must be primed.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies

Back to SBS Modified Bitumen Construction Details

Back to Construction Details